BRIDGE REHABILITATION
OTA ACCESS MUSKOGEE TURNPIKE (SH-351)/ COUNTY ROAD (E0770):
OVER MUSKOGEE TURNPIKE, 7.27 MILES NORTHWEST OF THE US-69 I
NTERCHANGE NEAR MUSKOGEE.
PROJECT LENGTH = 1.657 MILES
The work includes roadway items such as clearing and grubbing, unclassified excavation, rock excavation, salvaged topsoil, temporary silt fence, temporary silt dike, temporary rock filter dam, temporary inlet sediment filter, solid slab sodding, vegetative mulching, mowing, stabilized construction exit, aggregate base type A, stabilized subgrade, separator fabric, traffic bound surface course type E, tack coat, prime coat, Superpave types S3 and S4, PCC pavement placement, dowel jointed PCC pavement, PCC for pavement, structural excavation, class A and C concrete, reinforcing steel, type I plain riprap, inlets, RCP pipe, prefabricated culvert end sections, removal of structures and obstructions, removal of fence, concrete pavement, asphalt pavement, guardrail, sawing pavement, fence, and concrete longitudinal barrier. Bridge work includes substructure excavation, CLSM backfill, approach slab, saw-cut grooving, concrete rail, structural steel, weathering steel fixed bearing assembly, stainless steel expansion bearing assembly, elastomeric bearing pads, class AA, A, and C concrete, slope wall, epoxy coated reinforcing steel, piles, pilot holes, pile splice, water repellent, drilled shafts, crosshole sonic logging, sealer crack preparation, sealer resin, perforated pipe underdrain, non-perforated pipe underdrain, outlet lateral headwall, and removal of existing bridge structure. Traffic signing and striping includes structural concrete, reinforcing steel, removal of existing signs, sheet aluminum signs, extruded aluminum panel signs, galvanized steel posts, pipe posts, square tube posts, delineators, traffic stripe, pavement markers, and impact attenuator. Traffic control includes construction traffic stripe, pavement marking removal, construction zone impact attenuator, portable longitudinal barrier, arrow display, construction signs, barricades, warning lights, drums, channelizer cones, traffic surveillance, and portable changeable message sign. Tolling includes structural steel, drilled shafts, crosshole sonic logging, concrete sidewalk, electric service and connection, electrical equipment, PVC conduit, pull boxes, structural concrete, electrical conductors, cabinet, and galvanized steel overhead toll gantry. Staking includes construction staking level II. Construction includes SWPPP documentation and management and mobilization.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260305), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.