PEDESTRIAN IMPROVEMENTS (SIDEWALK)
CITY STREET (NORTH MACARTHUR BOULEVARD/ NW EXPRESSWAY):
FROM 1.9 MILES NORTH OF SH-66, EXTEND NORTH AND WEST IN
THE CITY OF WARR ACRES.
PROJECT LENGTH = 0.838 MILES
The work includes clearing and grubbing, unclassified excavation and borrow, topsoil placement, erosion control measures (silt fence, fiber logs, sodding, vegetative mulching), installation of concrete sidewalk, driveway, curb and gutter, tactile warning devices, and removal of existing curb, gutter, concrete pavement, and sidewalk. It also includes traffic sign installation and removal, pavement striping, construction staking, and mobilization/SWPPP documentation, along with temporary traffic control devices such as barricades, drums, cones, warning lights, and flaggers, over a project length of 0.838 miles.
We post new concrete opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260295), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.