GRADE, DRAIN, BRIDGE AND SURFACE
COUNTY ROAD (S 510 ROAD):
FROM THE INTERSECTION OF SOUTH INDIAN ROAD,
EXTEND SOUTHEAST NEAR PETTIT.
PROJECT LENGTH = 0.686 MILES
The work includes roadway items such as clearing and grubbing, unclassified excavation, borrow, topsoil, silt fence, sodding, mulching, stabilized subgrade, base and surface processing, asphalt courses, tack and prime coats, superpave, structural excavation, concrete, reinforcing steel, riprap, curb and gutter, driveway, pipe, culvert ends, removal of structures, fence, pavement, driveway, pipe, slab, sawing, guardrail, fence, gate, mailbox, and bridge items including excavation, concrete, reinforcing steel, and riprap, plus traffic items such as sign removal, portable traffic signal system, signs, striping, barrier, construction signs, barricades, warning lights, drums, flagger, staking, SWPPP documentation, and mobilization.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260268), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.