BRIDGE AND APPROACHES
COUNTY ROAD (EW-1950): OVER COOPER CREEK,
3.25 MILES EAST OF THE TEXAS STATE LINE NEAR DAVIDSON.
PROJECT LENGTH = 0.236 MILES
The work includes roadway items such as clearing and grubbing, earthwork, temporary silt fence and dike, solid slab sodding, vegetative mulching, traffic bound surface course type E, class C concrete, type I plain riprap with filter blanket, 24-inch corrugated galvanized steel pipe, and type B3 culvert end treatment. Bridge 'A' work includes substructure excavation common, granular backfill, prestressed concrete beams (type IV), concrete rail (TR3), structural steel, weathering steel fixed and expansion bearing assemblies, class AA and class A concrete, reinforcing steel, furnished and driven H-piles (HP 10x42 and HP 12x53), pile splice, type I plain riprap with filter blanket, perforated and non-perforated pipe underdrain, removal of existing bridge structure, and guardrail anchor units. Traffic items include construction signs, barricades, and warning lights. Also included are construction staking level II, SWPPP documentation and management, and mobilization.
We post new structural work opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Oklahoma Department of Transportation (solicitation 260261), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.