MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70
Contract: DB00634 — POC
Letting: NCDOT Division 2 — bids open 10-14-2026
Documents: DB00634 INVITATION.pdf (Invitation to Bid); DB00634 PLANS.pdf (Plans); DB00634 PROPOSAL.pdf (Proposals)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 2
PROJECT DEVELOPMENT GROUP
GREENVILLE, NC 27834
Telephone: (252) 439-2828
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
1037 W.H. SMITH BLVD.
GREENVILLE, NC 27834
September 16, 2026
CONTRACT: DB00634
WBS ELEMENT: 2027CPT.02.04.20251, 2027CPT.02.04.10251
COUNTY: CRAVEN
ROUTE: US-17 & SR-9001
DESCRIPTION: MILLING, RESURFACING, AND SHOULDER
RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM
JONES COUNTY TO US-70
NOTICE TO PROSPECTIVE BIDDERS
INVITATION TO BID ON PURCHASE ORDER CONTRACT
The North Carolina Department of Transportation is requesting bids for the above
referenced project. The contractor must furnish all labor, materials, equipment, and any
other items necessary for the completion of this contract.
BID OPENING
Electronic bids must be received at the Division 2 Project Development Office, Located
at 1037 W.H. Smith Blvd., Greenville, by Wednesday, October 14, 2026 at 2:00 PM.
Bids for this project must be submitted electronically using the on-line system Bid
Express®. Refer to the Instructions to Bidders in the proposal for more information.
The North Carolina Department of Transportation, in accordance with the provisions of
Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the regulations of the
Department of Transportation (49 CFR, Part 21), issued pursuant to such act, hereby
notifies all bidders that it will affirmatively ensure that the contract entered into pursuant
to this notice will be awarded to the lowest responsible bidder without discrimination on
the grounds of sex, race, color, or national origin.
The contractor furnishes all labor, materials, equipment and other items necessary to mill 1.5 inches between rumble strips, place approximately 1.5-inch asphalt concrete surface course Type S9.5C, perform shoulder reconstruction after paving with positive drainage, and complete incidental milling, erosion control including silt fence, wattle and seed and mulching, and work-zone traffic control on US-17 and SR-9001.
We post new asphalt opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 INVITATION.pdf""Invitation to Bid""DB00631 INVITATION.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 PLANS.pdf""Plans""DB00631 PLANS.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00631 PROPOSAL.pdf""Proposals""DB00631 PROPOSAL.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF NC 11 FROM BRIDGE 64 TO SR 1720""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 INVITATION.pdf""Invitation to Bid""DB00634 INVITATION.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 PLANS.pdf""Plans""DB00634 PLANS.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70""https://connect.ncdot.gov/letting/Division 2 Letting/10-14-2026/DB00634 PROPOSAL.pdf""Proposals""DB00634 PROPOSAL.pdf""MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION OF US-17 (US 17 BYPASS) FROM JONES COUNTY TO US-70"Most North Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: North Carolina Department of Transportation (solicitation DB00634-2026-10-14), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.