Median Barrier Installation on US 80 from Clinton-Raymond Road to Shaw Road, known as Federal Aid Project No. HSIP-7314-00(040) / 109131301 in Hinds County.
Call: 16
Letting Date: October 27, 2026 (Regular Letting)
Project: Federal Aid Project No. HSIP-7314-00(040)
State Project No(s): 109131301
County: Hinds County, Mississippi
Plan Holders (2): Joe McGee Construction Company, Inc.; Simmons Erosion Control, Inc.
Bids must be submitted before the letting date and time. See the source links for the official proposal documents.
Install median barrier on US 80 from Clinton-Raymond Road to Shaw Road including removal of pavement, driveways, median and island pavement, curb and gutter, sidewalk, signs and pipe; borrow and excess excavation, site grading, structure excavation and geotextile stabilization; granular material, fine milling, jointed concrete pavement, saw cuts and tie bars; reinforced concrete pipe and arch pipe with end sections, castings, sidewalk and concrete curb; topsoil, sodding, grassing, mulch, bed preparation, tree bark mulch, wattles and watering across 166 pay items.
We post new asphalt opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Mississippi Department of Transportation (solicitation 20261027-16), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.