Sealed bids will be received by the Board of Supervisors of Pike County, Mississippi at the Pike County
Courthouse, Magnolia, Mississippi, until ____ a.m. on the __ day of ________ , 2026 and
shortly thereafter publicly opened for con
Any questions contact Garrett Smith, garrett.smith@neel-schaffer.com
Category: CONSTRUCTION
The project involves 0.370 miles of road maintenance (other than bridge) along Site A (Horace Holmes Drive) and Site B (Jaguar Trail). Principal items of work include mobilization, clearing and grubbing, removal of trees, junction box, concrete pipe, curb and gutter, concrete ditch, asphalt pavement, and pipe; unclassified excavation (FM) (2300 CY), borrow excavation (2000 CY), granular material (350 CY), crushed stone (1080 CY), asphalt (ST) (9.5 MM) (620 tons), class B structural concrete for minor structures (0.94 CY); installation of 18" and 36" reinforced concrete pipe, combination concrete curb and gutter (200 LF); maintenance of traffic; thermoplastic traffic striping (skip white, continuous white, continuous yellow), detail striping, legends, and edge striping; two-way reflective high performance raised markers (331 EA); reflectorized traffic warning and regulatory signs; commercial fertilizer, seeding, vegetative materials for mulch, temporary silt fence (1800 LF), and wattles (400 LF).
We post new asphalt opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: MPTAP (solicitation 46664), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.