(1): Job JCD0088 Route 63 PHELPS, TEXAS County. Coldmill and resurface from 1.55 miles north of I-44 in Phelps County to 0.1 miles south of Route CC in Texas County, the total length of improvement being 30.847 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes coldmilling bituminous pavement for removal of surfacing (3 in. thick or less), placing asphaltic concrete mixture PG 70-22 (SP125C mix), tack coat, pavement marking (thermoplastic and paint), guardrail (MGS guardrail, end anchors, crashworthy end terminals), signing (breakaway assemblies, posts, flat sheet and structural signs), signal items (loop detectors, video detection system), and miscellaneous items such as changeable message signs, digital speed limit assemblies, mobilization, and temporary traffic control.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-D01), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.