(1): Job JNE0235 Route 61 LINCOLN County. Coldmill and resurface from 1.3 miles north of Route 47 near Troy to Big Creek, the total length of improvement being 17.875 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes cold milling bituminous pavement for removal of surfacing (3 inches thick or less and greater than 3 inches thick), modified cold milling (depth transitions), furnishing and placing bituminous pavement mixtures (PG58-28H and PG76-22), tack coat (non-tracking), full-depth pavement repair (concrete, subgrade compaction, aggregate base, saw cutting, dowel bars, tie bars), pavement markings (paint and thermoplastic), shoulder rumble strips, traffic control (including changeable message signs, barricades, channelizers, and flashing arrow panels), mobilization, and miscellaneous lump sum traffic control. The project also includes bridge end transitions, optional temporary pavement marking paint, and non-tracking tack requirements.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-B04), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.