(1): Job JNE0107 Route 154 PIKE, RALLS County. Resurface from Route 19 south junction to Route 54 near Vandalia, the total length of improvement being 12.243 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes 1-inch bituminous pavement surface leveling (PG58-28H), tack coat, modified cold milling (depth transitions), permanent aggregate edge treatment, pavement markings (4-inch white and yellow class 1 pavement marking paint, 24-inch white preformed thermoplastic pavement marking, and stop bars), gravel or crushed stone for entrances, mobilization, and lump sum temporary traffic control. The project also requires coordination with other projects in the vicinity, work zone traffic management, and compliance with Buy America requirements.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-B03), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.