(1): Job J1P3168 Route 129, N SULLIVAN County. ADA improvements from Route YY to Pfeiffer Street in Green City, the total length of improvement being 1.196 miles.
Bid opening: 10/16/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes removal of improvements, class 3 excavation, culvert cleanout, linear grading, aggregate base, bituminous pavement mixture, tack coat, concrete curb ramp, truncated domes, sidewalk hand-railing, paved approach, concrete sidewalk, concrete curb, curb and gutter, integral curb, rock ditch liner, concrete swale gutter, full depth pavement repair saw cut, curved vane grate and frame, manhole frame and cover, lump sum temporary traffic control, moveable barricade, mobilization, additional mobilization for seeding, thermoplastic pavement marking, coldmilling bituminous pavement, contractor furnished surveying and staking, class B concrete, reinforcing steel, various pipe groups, precast concrete manhole, drop inlets, flared end sections, seeding, sediment trap rock, curb inlet check, sediment removal, silt fence, and erosion control blanket.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261016-A01), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.