We post new environment & conservation opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Project consists of furnishing all materials, labor, and equipment necessary
to provide hardening and flood protection upgrades to pump stations 0683.
It is the intent of WASD to obtain a complete functional, satisfactory and legally
operable installation under this Project, and any items of labor, equipment or
materials which may be reasonably assumed as necessary to accomplish this
end shall be supplied whether or not they are specifically shown on the
Drawings or stated herein. The Contractor shall provide all materials for the
Project unless they are specifically called out in these Specifications as being
supplied by the Department. The Contractor shall also supply all other labor,
material or equipment required to preclude damage to or loss of functionality of
any existing facility or system.
Technical Certification Requirements:
General Building Contractor, General Engineering
The Contractor shall provide all materials for the Project unless they are specifically called out in these Specifications as being supplied by the Department. The Contractor shall also supply all other labor, material or equipment required to preclude damage to or loss of functionality of any existing facility or system. The Contractor must obtain and submit all permits prior to performing any work.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Miami-Dade County Strategic Procurement Department (solicitation RPQ-No-P16176), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.