We post new electrical opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project is to replace courtyards light fixtures to an existing multi-family residential development, Annie Coleman 15 (FL5-015), located at 2200 NW 57th Street, Miami, Florida 33142 and 5575 NW 27th Avenue, Miami, Florida 33142. Scope of work includes the replacement of courtyards light fixtures as depicted on construction documents prepared by prepared by Genesis Fortune, LLC Consulting Engineering and Miami-Dade County Project Manual.
The Contractor shall be responsible for all job tasks associated with the successful work of the stated scope of work, as required and approved by an authorized HCD representative. Tasks, clean-up, and removal of all items not specifically mentioned in the scope, but which are obviously required for an operable/functional system shall be included without additional cost to HCD. The Contractor shall arrange for his/her own storage facility (if needed). The Contractor shall leave the site free and clear of all debris. The Contractor is responsible for providing all materials, labor, equipment, and permits/inspection fees (when necessary) for the total completion of this work. All work shall be performed in the best standards of workmanship and shall be in accordance with Florida Building Code, all national, state, county, and municipal codes, rules, guidelines, regulations, and departments having jurisdiction.
Technical Certification Requirements:
Electrical Contractor
The scope of work includes the replacement of courtyards light fixtures as depicted on construction documents prepared by Genesis Fortune, LLC Consulting Engineering and Miami-Dade County Project Manual. The Contractor shall be responsible for all job tasks associated with the successful work of the stated scope of work, as required and approved by an authorized HCD representative. Tasks, clean-up, and removal of all items not specifically mentioned in the scope, but which are obviously required for an operable/functional system shall be included without additional cost to HCD. The Contractor shall arrange for his/her own storage facility (if needed). The Contractor shall leave the site free and clear of all debris. The Contractor is responsible for providing all materials, labor, equipment, and permits/inspection fees (when necessary) for the total completion of this work. All work shall be performed in the best standards of workmanship and shall be in accordance with Florida Building Code, all national, state, county, and municipal codes, rules, guidelines, regulations, and departments having jurisdiction.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Miami-Dade County Strategic Procurement Department (solicitation RPQ-No-104035), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.