6.40 mi of concrete shoulder widening, concrete curb and gutter, sidewalk, culverts, drainage, sewer, rehabilitation of 4 structures to include steel sheet piling, steel piles, approach work and pavement markings on US-131 from I-96 to Post drive in the city of Walker, Kent County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year concrete surface coating warranty and a 2 year bridge coating warranty.
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B, Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Proposals and plans: http://mdotcf.state.mi.us/public/eprop/login/index.cfm
6.40 mi of concrete shoulder widening, concrete curb and gutter, sidewalk, culverts, drainage, sewer, rehabilitation of 4 structures to include steel sheet piling, steel piles, approach work and pavement markings on US-131 from I-96 to Post drive in the city of Walker, Kent County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year concrete surface coating warranty and a 2 year bridge coating warranty.
We post new concrete opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.