■ Only the following five Contractors can bid on this project as a Prime Contractor:
• Calex Engineering
• Clarke Contracting
• Jilk Heavy Construction, Inc.
• Mike Prlich & Sons, Inc.
• Mladen Buntich Construction Company
♦ The project site is located on the south side of Benner Street in the Highland Park area of Los Angeles in a residential area approximately half a mile southwest of the intersection of York Boulevard and Figueroa Street. The sidewalk is exhibiting separation and uplift away from the curb for a length measuring approximately 45 linear feet, creating a gap as wide as 1.5 inches. The east edge of the sidewalk is also undermined 15 to 20 inches, creating a potential tripping hazard to pedestrian traffic.
♦ This project will mitigate the threat to public safety by constructing a new pipe and board retaining structure to restore lateral support to the sidewalk. The pipe and board will be 85 feet in length and 5 feet in height. The existing handrail will be removed and replaced. A portion of the sidewalk, curb, and gutter will also be removed and replaced. All proposed work is located within the public right of way.
♦ See bid package for full scope & details
♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder
♦ For Bid Results visit http://engineering.lacity.gov/contractors/
This project will mitigate the threat to public safety by constructing a new pipe and board retaining structure 85 feet in length and 5 feet in height to restore lateral support to the sidewalk. The existing handrail will be removed and replaced, and a portion of the sidewalk, curb, and gutter will also be removed and replaced. All proposed work is located within the public right of way on the south side of Benner Street in the Highland Park area of Los Angeles.
We post new excavating opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Los Angeles RAMP (bid 232167), retrieved via the City of Los Angeles. View the official posting, and always confirm requirements and deadlines with the issuing agency.