RFB-52-27 23042AMLBAML, PIKE COUNTY
Category: CON. Type: Request for Bids (RFB). Agency: Facilities & Support Services. Documents: Final_RFB_785_2700000095_1_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,1] - Solicitation Printer; Addendum One.pdf; Final_RFB_785_2700000095_2_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,2] - Solicitation Printer; Addendum Two.pdf; Final_RFB_785_2700000095_3_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,3] - Solicitation Printer; Final_RFB_785_2700000095_4_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,4] - Solicitation Printer; Addendum Four.pdf; Final_RFB_785_2700000095_5_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,5] - Solicitation Printer; Addendum Five.pdf; Final_RFB_785_2700000095_6_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,6] - Solicitation Printer; Addendum Six.pdf; Final_RFB_785_2700000095_7_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,7] - Solicitation Printer; Addendum Seven.pdf; Final_RFB_785_2700000095_8_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000095,8] - Solicitation Printer
The contractor must improve and construct access roads to drilling areas, drill 22 boreholes (approximately 10 ft of soil and 110 ft of rock per hole), install 8-inch steel casing (10 ft per hole), and inject phenolic foam with packers and flowable fill to extinguish the underground coal seam fire. A burning gob pile will be excavated, quenched with water, and replaced. Work also includes site preparation (clearing, grubbing, access roads, temporary culverts), erosion and sediment control (silt barriers, erosion control blanket), earthwork (grading, burning refuse extinguishment), equipment usage (hoe ram), portal closures (4 standard non-wildlife), revegetation (seedbed preparation, agricultural limestone, fertilizer, seed, mulch, cover crop), roadway stone placement, bituminous repair, and utility relocation/replacement. The contract duration is 365 calendar days from award.
We post new other opportunities in Kentucky as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Kentucky work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: Facilities & Support Services (solicitation RFB-785-2700000095-8), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.