SMALL STRUCTURE PIPE LINING
Contract: R-43915-A (Call 231)
District: LaPorte District
Project control nos.: 2100762
Completion date: August 01, 2027
Goals: DBE Goal: 0.00
Prequalification: E(E) 0290
Bids open November 5, 2026 at 10:00 AM local via Bid Express (https://bidx.com/in/lettings).
Contractors must register in advance by emailing their request to bid to INDOTbidders@indot.in.gov no later than 9:00 AM on the bid opening date.
Section No.: 1 SMALL STRUCTURE PIPE LINING
.
Line
Item No Item Code Description Quantity Unit
0001 105-06845 CONSTRUCTION ENGINEERING 1.00 LS
0002 109-08359 LIQUIDATED DAMAGES 1.00 DOL
0003 109-08360 CONTRACT LIENS 1.00 DOL
0004 109-08443 QUALITY ADJUSTMENTS, TEMPORARY TRAFFIC CONTROL DEVICES AND MARKINGS 1.00 DOL
0005 109-08444 QUALITY ADJUSTMENTS, FAILED MATERIALS 1.00 DOL
0006 109-11362 QUALITY ADJUSTMENTS, FAILURE TO MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES 1.00 DOL
0007 110-01001 MOBILIZATION AND DEMOBILIZATION 1.00 LS
0008 201-52370 CLEARING RIGHT-OF-WAY 1.00 LS
0009 202-99187 FENCE, FARM FIELD, REMOVE 160.00 LFT
0010 205-11626 PUMP AROUND 1.00EACH
0011 205-12108 STORMWATER MANAGEMENT BUDGET 21900.00 DOL
0012 205-12616 STORMWATER MANAGEMENT IMPLEMENTATION 1.00 LS
0013 601-06035 GUARDRAIL, RESET 75.00 LFT
0014 603-06040 FENCE, FARM FIELD, 47 IN. 190.00 LFT
0015 616-06405 RIPRAP, REVETMENT 332.00 TON
0016 616-12249 GEOTEXTILE FOR RIPRAP, TYPE 2B 364.00 SYS
0017 621-01004 MOBILIZATION AND DEMOBILIZATION FOR SEEDING 1.00EACH
0018 621-06559 MULCHED SEEDING, TYPE R 4775.00 SYS
0019 621-06567 WATER 21.00 kGAL
0020 621-06570 TOPSOIL 555.00 CYS
0021 621-09867 MULCHED SEEDING 214.00 SYS
0022 725-10228 LINER PIPE, THERMOPLASTIC, CIRCULAR, 37.7-38.5 SFT 355.00 LFT
0023 801-06207 TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN. 4894.00 LFT
0024 801-06640 CONSTRUCTION SIGN, TYPE A 18.00EACH
0025 801-06710 FLASHING ARROW SIGN 60.00 DAY
0026 801-06775 MAINTAINING TRAFFIC 1.00 LS
0027 801-07024 ENERGY ABSORBING TERMINAL, CZ, TL-3 1.00EACH
0028 801-08401 TEMPORARY TRAFFIC BARRIER, TYPE 2 550.00 LFT
0029 808-06716 LINE, REMOVE 1320.00 LFT
0030 808-96075 LINE, THERMOPLASTIC, BROKEN, WHITE, 6 IN. 340.00 LFT
The work includes furnishing and installing 355 linear feet of liner pipe, thermoplastic, circular, 37.7-38.5 SFT; clearing right-of-way; removing 160 linear feet of farm field fence; pump around; stormwater management budget of 21,900 DOL; resetting 75 linear feet of guardrail; installing 190 linear feet of farm field fence, 47 in.; placing 332 tons of riprap revetment and 364 square yards of geotextile for riprap, type 2B; mobilization and demobilization for seeding; 4,775 square yards of mulched seeding, type R; 21 kGAL of water; 555 cubic yards of topsoil; 214 square yards of mulched seeding; temporary pavement marking, removable, 4 in., 4,894 linear feet; construction sign, type A, 18 each; flashing arrow sign for 60 days; maintaining traffic; energy absorbing terminal, CZ, TL-3, 1 each; temporary traffic barrier, type 2, 550 linear feet; removing 1,320 linear feet of line; and installing 340 linear feet of thermoplastic broken white line, 6 in.
We post new plumbing opportunities in Indiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Indiana Department of Transportation (solicitation R43915A-20261105), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.