HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings and other required work.
Item: 057
Contract: 85800
Region/District: 2 / 2
DBE goal: Pending%
VBP goal: Pending%
Federal Project: 6TSR(845)
Key Routes: FAU 9886
Marked Routes: OLD RIVER ROAD
Sections: 23-00724-00-RS
State Jobs: C-92-064-24
Contract specifics:
The work consists of HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings, excavating and grading existing shoulder, removal and disposal of unsuitable material, trench backfill, seeding, fertilization, mulching, stone dumped riprap, filter fabric, aggregate subgrade improvement, hot-mix asphalt base course widening, aggregate for temporary access, bituminous materials (tack coat), longitudinal joint sealant, hot-mix asphalt surface removal, temporary ramp, hot-mix asphalt binder and surface courses, incidental hot-mix asphalt surfacing, gutter removal, sidewalk removal, class D patches, aggregate wedge shoulder, concrete removal, pipe culvert removal, box culvert end sections, precast concrete box culverts, precast reinforced concrete flared end sections, pipe culverts, inlets, removing inlets, class SI concrete (outlet), concrete gutter, steel plate beam guardrail, strong post guardrail attached to culvert, traffic barrier terminal, delineators, shoulder rumble strips, mobilization, thermoplastic pavement marking, concrete structures (special), box culvert removal, sanitary manholes to be adjusted, center line rumble strip, traffic control and protection, and construction layout.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 85800), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.