Bridge deck overlay on SN 091-0069 carrying IL 3 / IL 146 over Running Lake Ditch, 2 miles south of Ware.
Item: 133
Contract: 78B44
Region/District: 5 / 9
DBE goal: Pending%
VBP goal: Pending%
Federal Project: NHPPZEW2(841)
Key Routes: FAP 312
Marked Routes: IL 3/ IL 146
Sections: D9 BRIDGE OVERLAY 2026-5
State Jobs: C-99-086-25
Contract specifics:
The work includes bridge deck overlay, deck slab repair (partial), approach slab repair (partial depth), concrete bridge deck scarification, bridge deck thin polymer overlay, mobilization, traffic control and protection, temporary bridge traffic signals, temporary rumble strips, changeable message signs, short term pavement marking and removal, paint pavement marking, raised reflective pavement marker removal, pavement marking removal by grinding, cleaning underdrain outlets, remove and replace concrete headwalls for pipe underdrains, and traffic signal battery backup system.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 78B44), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.