Resurfacing and adding shoulders on IL 4 from 0.3 miles south of IL 143 to north of Blue Spruce Lane near St. Jacob.
Item: 121
Contract: 76V30
Region/District: 5 / 8
DBE goal: Pending%
VBP goal: Pending%
Federal Project: NHPPMFIF(211)
Key Routes: FAP 314
Marked Routes: IL 4
Sections: (110,111)RS-6
State Jobs: C-98-156-26
Contract specifics:
The work includes excavating and grading existing shoulder, bituminous materials (prime coat and tack coat), longitudinal joint sealant, material transfer device, temporary ramp, hot-mix asphalt binder and surface courses, hot-mix asphalt surface removal, aggregate wedge shoulder, hot-mix asphalt shoulders, shoulder rumble strips, sinusoidal rumble strips, engineer's field office, mobilization, traffic control and protection (multiple standards), changeable message sign, short term pavement marking and removal, temporary pavement marking (paint), thermoplastic pavement marking, raised reflective pavement marker and removal, pavement marking removal (water blasting), and trainees.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 76V30), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.