55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line.
Item: 120
Contract: 76V29
Region/District: 5 / 8
DBE goal: Pending%
VBP goal: Pending%
Federal Project: N/A
Key Routes: FAP 312, FAP 861A
Marked Routes: IL 3, IL 4/IL 150
Sections: DIST 8 PATCHING 2027-1
State Jobs: C-98-155-26
Contract specifics:
Perform pavement patching over 55.2 miles on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line, including earth excavation, geotechnical fabric for ground stabilization, subbase granular material Type B 6-inch, triaxial geogrid reinforcement, welded wire reinforcement, dowel bars, tie bars, saw cuts, Class B patches Type II, III and IV 12-inch (Special), engineer’s field office Type A, mobilization, traffic control and protection, temporary and permanent pavement markings and pavement marking removal, and trainees training program graduate hours.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 76V29), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.