1.2 miles of resurfacing on IL 3 from Halifax Drive to 0.2 miles north of Market Street in Waterloo.
Item: 119
Contract: 76V28
Region/District: 5 / 8
DBE goal: Pending%
VBP goal: Pending%
Federal Project: NHPPW8U1(626)
Key Routes: FAP 312
Marked Routes: IL 3
Sections: 68RS-1-2-1
State Jobs: C-98-154-26
Contract specifics:
Work includes hot-mix asphalt surface removal, placement of hot-mix asphalt binder and surface courses with material transfer device, bituminous tack coat and longitudinal joint sealant, hot-mix asphalt shoulders and aggregate wedge shoulder, 8-inch shoulder rumble strips, thermoplastic and temporary pavement markings, raised reflective pavement markers and removal, detector loop replacement, traffic control and protection with surveillance and changeable message signs, mobilization, Type A engineer's field office, trainees hours and survey monument cover assemblies.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 76V28), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.