Culvert replacement 0.4 miles west of 780E and 0.4 miles east of Woodhull Rd in Henry County.
Item: 041
Contract: 64F26
Region/District: 2 / 2
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STPRH8N(522)
Key Routes: FAP 639
Marked Routes: IL 17
Sections: 131T
State Jobs: C-92-109-23
The work includes tree removal, earth excavation, porous granular embankment, trench backfill, topsoil furnish and place, seeding, mowing, mulch, erosion control blanket, turf reinforcement mat, temporary erosion control seeding, temporary ditch checks, aggregate ditch checks, perimeter erosion barrier, inlet and pipe protection, stone dumped riprap, filter fabric, aggregate subgrade improvement, aggregate base course, bituminous materials, hot-mix asphalt binder and surface courses, hot-mix asphalt surface removal, driveway pavement removal, class D patches, aggregate shoulders, removal of existing structures, concrete removal, pipe culvert removal, removal and disposal of unsuitable material for structures, concrete structures, reinforcement bars, precast concrete box culverts, concrete collar, traversable pipe grate, sloped metal end sections, concrete end sections, pipe culverts, concrete headwalls, pipe drains, pipe underdrains, field tile junction vaults, guardrail removal, delineators, right of way markers, permanent survey markers, engineer's field office, mobilization, traffic control and protection, changeable message sign, short term pavement marking, temporary pavement marking, sign panels, remove sign panel assemblies, telescoping steel sign support, wood sign support, modified urethane pavement marking, grooving for recessed pavement marking, stone riprap (special), aggregate shoulder removal, drop boxes, traffic control and protection (special), temporary sign panel assembly, construction layout, and rock fill.
We post new plumbing opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 64F26), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.