HMA resurfacing of Brainard Ave. from Harding Ave. to 31st St. in the village of LaGrange Park. Additional work includes drainage improvements, sidewalks, ADA ramps, pavement patching and other required work.
Item: 033
Contract: 61M74
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: 3WGZ(085)
Key Routes: FAU 2704
Marked Routes: BRAINARD AVENUE
Sections: 26-00104-00-RS (LAGRANGE PARK)
State Jobs: C-91-265-26
Contract specifics:
The work includes removal of approximately 8,250 square yards of variable depth hot-mix asphalt, placement of 750 tons of IL-9.5 binder course and 870 tons of IL-9.5 surface course material, 5,000 square feet of portland cement concrete sidewalk construction, 2,100 feet of combination concrete curb and gutter, removal and reinstallation of 5,000 square feet of sidewalk and 375 square yards of driveway pavement, pavement patching in four types and depths, drainage improvements including 21 inlet filters and adjustments to 20 frames and lids, reconstruction of 2 manholes, thermoplastic pavement marking (1,700 linear feet at 4 inches, 275 feet at 6 inches, 115 feet at 24 inches), tree protection and root pruning, temporary fencing and information signing, washout basin, and detector loop replacement. Work must be completed in 30 working days.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61M74), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.