We post new exterior installation opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Sealed RFPs will be received by the City of Dalton Finance Department located at 300 W. Waugh Street, Dalton, Georgia 30722 until: TUESDAY, SEPTEMBER 1, 2026, AT 2PM for the furnishing of all materials, labor, tools, skill, equipment and incidentals unless noted otherwise for the construction of the project entitled:
SYNTHETIC TURF FIELD REPLACEMENT FOR: Broaddus/Durkin Soccer Fields
at which time and place the sealed RFPs will be opened but not read aloud. RFPs received after the designated time will not be considered.
The principal items of construction are: Removal of existing turf, Stone base work and drainage, replacing turf and repairing any surrounding areas that were disturbed during the renovation.
Submitting company shall inform themselves of and comply with all conditions and specifications contained in the RFP package, contract, related documents and State and Federal Law.
A Mandatory pre-RFP meeting is scheduled for 10:00 AM Wednesday, August 12, 2026 to begin at the Mack Gaston Community Center. Please reserve time to tour the site location. Failure to attend the mandatory pre-RFP meeting will result in disqualification of RFP.
Contract documents and the RFP package for this project may be obtained electronically via the City of Dalton's webpage @ http://www.daltonga.gov.
Anyone seeking to submit an RFP on and/or perform work on this project must be prequalified by the Georgia Department of Transportation or has successfully completed a project for the City of Dalton in the last 5 years of similar scope or has completed similar projects and can provide three references demonstrating experience in construction of similar facilities.
CITY OF DALTON, GEORGIA
BY Steve Roberts
Director of Parks and Recreation
The principal items of construction are: Removal of existing turf, Stone base work and drainage, replacing turf and repairing any surrounding areas that were disturbed during the renovation. Additional details include equipment and mobilization, construction entrance including fence removal/replacement, sidewalk protection, erosion control, removal and recycle of standard SBR/Sand synthetic turf system, line package matching existing lines at Ron Nix Soccer Complex, maintenance/grooming equipment including owner training, manufacturer warranty, and possible replacement of nailer board and concrete curb.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-75552-NONST-2026-000000065), retrieved via the Georgia Procurement Registry (DOAS). View the official posting , always confirm requirements and deadlines with the issuing agency.