We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Fulton County, Georgia "County" This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran Mill Rd, that will convey flows to FPS. Both FPS and CRPS flows will be discharged to the Fulton County Cedar Grove Pump Station and to the Jones Road interceptor sewer where a tee, valve and manifold shall be installed for future connections. The invert Elevation at FPS will be set to allow the gravity system to enter from both northern and western sides of the wet well.
`
REQUEST FOR PROPOSAL PROGRESSIVE DESIGN/BUILD 26RFP150795K-JAJ
FRIENDSHIP PUMP STATION PROGRESSIVE
DESIGN/BUILD
For
DEPARTMENT OF PUBLIC WORKS
RFP ISSUANCE DATE: July 6, 2026
RFP DUE DATE AND TIME: August 12, 2026 AT 11:00 AM
PRE-PROPOSAL CONFERENCE DATE: July 22, 2026
PURCHASING CONTACT: James A. Jones
E-MAIL: james.jones@fultoncountyga.gov
LOCATION: FULTON COUNTY GOVERNMENT
DEPARTMENT OF PURCHASING & CONTRACT COMPLIANCE
130 PEACHTREE STREET, S.W., SUITE 1168
ATLANTA, GA 30303
`
TABLE OF CONTENTS
SECTION 1 – INTRODUCTION................................................................................................................1
1.1 PROJECT DESCRIPTION ................................................................................................................1
1.3 METHOD OF SOURCE SELECTION ...............................................................................................2
1.4 BACKGROUND................................................................................................................................. 2
1.5 COUNTY OBJECTIVES ....................................................................................................................3
1.5.1 PROGRESSIVE DESIGN/BUILD DELIVERY SERVICES ............................................................3
1.9 PROPOSAL DUE DATE ...................................................................................................................5
1.10 CONTACT PERSON AND INQUIRIES ..........................................................................................5
1.11 PROCUREMENT SCHEDULE ......................................................................................................6
SECTION 2 – INSTRUCTIONS TO PROPOSERS ............................................................
The selected PD/B entity will provide Progressive Design/Build services for the design and construction of the Friendship Pump Station and its associated force main. Phase 1 – Pre-construction Phase Services shall consist of planning, design, bidding of component packages and preparation of a Guaranteed Maximum Price (GMP). The completed pump stations and forcemain shall not impact adjoining properties; control of site lighting, noise, and odor shall be included in the design. The design shall include a tee, valve and manifold at the Jones Road interceptor sewer for future connections, and the forcemain alignment within the right-of-way of South Fulton Parkway. The PD/B Team shall be experienced in acquiring right-of-way encroachment permits from Georgia DOT.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-66096-NONST-2026-000000188), retrieved via the Georgia Procurement Registry (DOAS). View the official posting , always confirm requirements and deadlines with the issuing agency.