We post new decks and porches opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project includes canopy work at three Cobb County School District locations, as outlined below: – Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide.
Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. – East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide.
Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80" in length by 10" wide. – Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies – please refer to the drawings.
The project includes canopy work at three locations: Cheatham Hill Elementary School – demolish approximately 1,600 square feet of existing concrete sidewalk, design and install a new canopy approximately 245 feet long and 8 feet wide, demolish and replace approximately 2,200 square feet of concrete at the front entrance, replace the existing flagpole, and install new curb and gutter at all new sidewalk areas. East Side Elementary School – base bid install a new canopy at the main entrance approximately 75 feet long and 10 feet wide, and Alternate #1 add a new canopy at the side Entry Canopy / ASP Doorway in an L-shaped configuration approximately 80 inches in length by 10 inches wide. Palmer Middle School – design and install a new canopy system extending from the front entrance to the drive aisle and continuing along the drive aisle for the full length of the student pick-up area, approximately 270 feet long with varying width.
Source: Georgia Procurement Registry (solicitation PE-63310-NONST-2027-000000212), retrieved via the Georgia Procurement Registry (DOAS). View the official posting , always confirm requirements and deadlines with the issuing agency.