0.106 MILE OF RECONSTRUCTION FOR REALIGNMENT OF DUAL RIGHT TURN LANES ON SR 10 AT WEST PARK PLACE BLVD (CR 2560).
150-1000 TRAFFIC CONTROL - 0018025 — LUMP LUMP156-0100 GPS DATA COLLECTION AND SUBMITTAL — LUMP LUMP163-0232 TEMPORARY GRASSING — 1.000 AC163-0240 MULCH — 11.000 TN163-0301 CONSTRUCT AND REMOVE CONSTRUCTION EXITS — 2.000 EA163-0520 CONSTRUCT AND REMOVE TEMPORARY PIPE SLOPE DRAIN — 85.000 LF163-0550 CONSTRUCT AND REMOVE INLET SEDIMENT TRAP — 5.000 EA165-0030 MAINTENANCE OF TEMPORARY SILT FENCE, TP C — 270.000 LF165-0101 MAINTENANCE OF CONSTRUCTION EXIT — 1.000 EA165-0105 MAINTENANCE OF INLET SEDIMENT TRAP — 5.000 EA165-0310 MAINTENANCE OF CONSTRUCTION EXIT TIRE WASH AREA (PER EACH) — 1.000 EA171-0030 TEMPORARY SILT FENCE, TYPE C — 540.000 LF210-0100 GRADING COMPLETE - 0018025 — LUMP LUMP310-5120 GR AGGR BASE CRS, 12 INCH, INCL MATL — 1,150.000 SY402-1802 RECYCLED ASPH CONC PATCHING, INCL BITUM MATL & H LIME — 20.000 TN402-1812 RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H LIME — 50.000 TN402-3121 RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME — 468.000 TN402-3190 RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,INCL BITUM MATL & H LIME — 280.000 TN402-4510 RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL POLYMER-MODIFIED BITUM MATL & H LIME — 227.000 TN413-0750 TACK COAT — 380.000 GL432-5010 MILL ASPH CONC PVMT, VARIABLE DEPTH — 1,010.000 SY441-0108 CONC SIDEWALK, 8 IN — 170.000 SY441-6222 CONC CURB & GUTTER, 8 IN X 30 IN, TP 2 — 495.000 LF441-6740 CONC CURB & GUTTER, 8 IN X 30 IN, TP 7 — 95.000 LF446-1100 PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH — 330.000 LF456-2080 SINUSOIDAL CENTERLINE RUMBLE STRIPS-GROUND IN PLACE (CONTINUOUS), 16IN (400 MM) — 1.000 GLM500-9999 CLASS B CONC, BASE OR PVMT WIDENING — 3.000 CY515-2015 GALV STEEL PIPE HANDRAIL - 42 IN — 35.000 LF550-4218 FLARED END SECTION 18 IN, STORM DRAIN — 1.000 EA550-4418 FLARED END SECTION, 18 IN, SLOPE DRAIN — 1.000 EA550-5180 STORM DRAIN PIPE, 18 IN, CLASS III — 250.000 LF576-1018 SLOPE DRAIN PIPE, 18 IN — 17.000 LF603-2182 STN DUMPED RIP RAP, TP 3, 24 IN — 20.000 SY603-7000 PLASTIC FILTER FABRIC — 20.000 SY621-6203 CONCRETE SIDE BARRIER, TP 2-SC — 190.000 LF632-0003 CHANGEABLE MESSAGE SIGN, PORTABLE, TYPE 3 — 2.000 EA639-3004 STEEL STRAIN POLE, TP IV (W/ 60 FT MAST ARMS) — 1.000 EA639-3004 STEEL STRAIN POLE, TP IV (W/ 65 FT MAST ARMS) — 1.000 EA641-1100 GUARDRAIL, TP T — 21.000 LF641-1200 GUARDRAIL, TP W — 112.000 LF641-5015 GUARDRAIL TERMINAL, TP 12A, 31 IN, TANGENT, ENERGY-ABSORBING — 1.000 EA643-8200 BARRIER FENCE (ORANGE), 4 FT — 560.000 LF647-1000 TRAFFIC SIGNAL INSTALLATION NO - 1 — LUMP LUMP647-3000 INTERNALLY ILLUMINATED STREET SIGN — 4.000 EA647-3100 INTERNALLY ILLUMINATED STREET NAME SIGN CONTROL ASSEMBLY — 4.000 EA653-0110 THERMOPLASTIC PVMT MARKING, ARROW, TP 1 — 1.000 EA653-0120 THERMOPLASTIC PVMT MARKING, ARROW, TP 2 — 6.000 EA653-0210 THERMOPLASTIC PVMT MARKING, WORD, TP 1 — 7.000 EA653-1704 THERMOPLASTIC SOLID TRAF STRIPE, 24 IN, WHITE — 407.000 LF653-1804 THERMOPLASTIC SOLID TRAF STRIPE, 8 IN, WHITE — 2,040.000 LF653-1906 THERMOPLASTIC SOLID TRAF STRIPE, 6 IN, WHITE — 500.000 LF653-6004 THERMOPLASTIC TRAF STRIPING, WHITE — 490.000 SY654-1003 RAISED PVMT MARKERS TP 3 — 36.000 EA668-1100 CATCH BASIN, GP 1 — 1.000 EA668-2100 DROP INLET, GP 1 — 4.000 EA668-5000 JUNCTION BOX — 1.000 EA680-5275 LUMINAIRE BRACKET ARM, 15 FT — 2.000 EA682-6110 CONDUIT, RIGID, 1 IN — 60.000 LF682-6120 CONDUIT, RIGID, 2 IN — 220.000 LF682-6219 CONDUIT, NONMETL, TP 2, 1 IN — 50.000 LF682-6222 CONDUIT, NONMETL, TP 2, 2 IN — 65.000 LF682-6233 CONDUIT, NONMETL, TP 3, 2 IN — 510.000 LF682-9950 DIRECTIONAL BORE - 5 IN — 175.000 LF687-1000 TRAFFIC SIGNAL TIMING - 1 — LUMP LUMP700-6910 PERMANENT GRASSING — 1.000 AC700-7000 AGRICULTURAL LIME — 2.000 TN700-8000 FERTILIZER MIXED GRADE — 1.000 TN700-8100 FERTILIZER NITROGEN CONTENT — 7.000 LB700-9300 SOD — 1,110.000 SY708-1000 PLANT TOPSOIL — 5,040.000 CY716-2000 EROSION CONTROL MATS, SLOPES — 275.000 SY936-4000 CCTV CAMERA SYSTEM, TYPE 1 — 1.000 EA936-4904 CCTV MOUNTING ARM, TYPE 4 J-HOOK — 1.000 EA937-6000 MICROWAVE RADAR DETECTION ASSEMBLY — 4.000 EA937-8020 TESTING - MICROWAVE DETECTION SYSTEM — LUMP LUMP937-8520 TRAINING - MICROWAVE DETECTION SYSTEM — LUMP LUMPSealed bids will be received using AASHTOWare Project Bids until 2026-10-16T15:00:00.000Z (11:00 AM Eastern on the letting date), per the Notice to Contractors published SEPTEMBER 18, 2026 (GPR event PE-48401-RFQ-2026-000000627). Plans are available online; proposals shall only be submitted electronically as specified in the Specifications.
The work includes traffic control, GPS data collection, temporary grassing, mulch, construction exits, temporary pipe slope drains, inlet sediment traps, maintenance of silt fence and construction exits, grading, aggregate base course, recycled asphalt concrete patching, leveling, and superpave layers, tack coat, milling asphalt concrete pavement, concrete sidewalk, curb and gutter, pavement reinforcing fabric strips, sinusoidal centerline rumble strips, class B concrete, galvanized steel pipe handrail, flared end sections, storm drain pipe, slope drain pipe, stone dumped rip rap, plastic filter fabric, concrete side barrier, portable changeable message signs, steel strain poles, guardrail, barrier fence, traffic signal installation, internally illuminated street signs, thermoplastic pavement markings, raised pavement markers, catch basins, drop inlets, junction boxes, luminaire bracket arms, conduit, directional boring, traffic signal timing, permanent grassing, agricultural lime, fertilizer, sod, plant topsoil, erosion control mats, CCTV camera system, CCTV mounting arm, microwave radar detection assembly, testing and training for the microwave detection system.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"54365772""https://ssl.doas.state.ga.us/gpr/downloadAttachment?attachmentId=54365772&sourceSystemType=gpr20""NOTICE TO CONTRACTORS _ OCTOBER 16_ 2026 LETT.pdf"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.