The major work will consist of the (approximate) following:
2,500 LF 7” Curb and Gutter
3,800 SF 6” Concrete Driveway
12,000 SF 4” Concrete Sidewalk
4,700 SY 3” Asphalt Pavement, Superpave SP-D
4,700 SY 11” Pavement Pulverization
76 TN Cemlime™
18 EA Barrier Free ADA Ramp