The major work will consist of the (approximate) following:
6,500 LF 8” water pipe by open cut
2,000 LF 8” sewer pipe by open cut
400 LF 8” sewer pipe by other than open cut
6,500 SY Pulverization and asphalt overlay
7,000 SY concrete pavement
20,000 SF concrete sidewalk
21,500 SF concrete driveway