The major work will consist of the following:
3,280 LF – 24” Water Line by Open Cut
130 LF – 42” Casing by Other Than Open Cut
144 LF – 12” Water Line by Open Cut
138 LF – 10” Water Line by Open Cut
6,408 LF – 8” Water Line by Open Cut
8 EA – 24” Gate Valve w/ Vault
24 EA – 8” Gate Valve
99 EA – Water Service
6,969 LF – 8” Sewer Pipe by Open Cut
43 EA – 4’ Sewer Manhole
105 EA – Sewer Service
13,672 SY – 11” Pavement Pulverization (3” Asphalt Type D)
21,106 SY – 12” Pavement Pulverization (1.5" Asphalt Superpave SP-D & 2.5" Asphalt Type B
The major work consists of 3,280 LF of 24-inch water line by open cut, 130 LF of 42-inch casing by other than open cut, 144 LF of 12-inch water line by open cut, 138 LF of 10-inch water line by open cut, 6,408 LF of 8-inch water line by open cut, 8 EA of 24-inch gate valve with vault, 24 EA of 8-inch gate valve, 99 EA of water service, 6,969 LF of 8-inch sewer pipe by open cut, 43 EA of 4-foot sewer manhole, 105 EA of sewer service, 13,672 SY of 11-inch pavement pulverization (3-inch Asphalt Type D), and 21,106 SY of 12-inch pavement pulverization (1.5-inch Asphalt Superpave SP-D & 2.5-inch Asphalt Type B).
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: City of Fort Worth (solicitation 245346), retrieved via the City of Fort Worth Bonfire procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.