A Mandatory Pre-Bid Meeting will be conducted via Microsoft Teams on 10/06/2026 at 10:00 AM. The Teams meeting link and access information are provided below: https://teams.microsoft.com/meet/296829629827622?p=QHnb0JctRGc9hJFrZo We are pleased to invite you to participate on Bid #C007139 2027 Milling and Resurfacing Project. The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: BID LINK HERE.
1.1 The Central Florida Tourism Oversight District (herein after “District”, “Owner” and “CFTOD”) is a Special Taxing District that serves as a local government entity. The District is responsible for its public infrastructure including, but not limited to roads, bridges, and water control system. The scope of work for the 2027 Milling & Resurfacing Project includes but is not limited to: Maintenance of Traffic/Temporary Traffic Control/Lane Closures; Erosion & Sedimentation Control; Existing Paver and Concrete Header Curb Demolition; Milling & Resurfacing; Signage & Pavement Markings and Patterned Pavement Installation 1.2 The Project is briefly described as follows: A. Milling & Resurfacing of the following locations: • Bonnet Creek Parkway and adjoining roadways from Buena Vista Drive to Vista Blvd including Backstage Lane and Overpass Road. • Hotel Plaza Blvd. from E. Buena Vista Drive to SR 535.
B. Milling & Resurfacing includes milling depths ranging from 1.5” to 5” and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG 82-22) depths ranging from 1.5” to 3.5” and Friction Course FC-12.5 (Traffic E) (PG 82-22) depth 1.5”. C. Scope of work at Hotel Plaza Blvd. also includes the removal of existing crosswalks, including concrete header curbs and pavers, and replacement with installation of final colored asphalt patterned pavement. Coordination with resort entrances is required to maintain at least one accessible entrance/exit at each resort throughout construction, with appropriate restrictions and traffic control measures implemented as needed. Commodities: Highway and road new construction service; Highway and road sign or guardrail construction and repair service; Highway and road maintenance service; Highway and road paving service; Highway and road resurfacing service
The scope of work includes Maintenance of Traffic/Temporary Traffic Control/Lane Closures; Erosion & Sedimentation Control; Existing Paver and Concrete Header Curb Demolition; Milling & Resurfacing; Signage & Pavement Markings and Patterned Pavement Installation. Milling depths range from 1.5" to 5" using SP Structural (Traffic E) (PG 82-22) and Friction Course FC-12.5 (Traffic E) (PG 82-22). At Hotel Plaza Blvd., work includes removal of existing crosswalks, concrete header curbs, and pavers, and replacement with final colored asphalt patterned pavement. Coordination with resort entrances is required to maintain at least one accessible entrance/exit at each resort throughout construction.
We post new asphalt opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Central Florida Tourism Oversight District (solicitation 17041), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.