We post new asphalt opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Town of Abington DPW is hereby soliciting bids for construction of two stormwater treatment Best Management Practices (BMPs). A grassed infiltration basin, porous pavement, and associated drainage shall be installed at Arnold Park located at 40 Harrison Avenue. A small rain garden and associated features shall be installed near the southwestern corner of the Town Hall located at 500 Gliniewicz Way.
All work must be completed within sixty (60) consecutive calendar days.
Construction of a grassed infiltration basin, porous pavement, and associated drainage at Arnold Park located at 40 Harrison Avenue, and a small rain garden and associated features near the southwestern corner of the Town Hall located at 500 Gliniewicz Way.
Source: COMMBUYS (Massachusetts) (bid BD-27-1472-ABGTN-ABGTN-131558), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting , always confirm requirements and deadlines with the issuing agency.