Mound Street Floodwall and WCLPP Repairs The existing floodwall located along the east side of the Scioto River, between Main Street and the Norfolk Southern/CSX Railroad bridge, is in disrepair. This project will investigate and evaluate the existing wall and levee system with regard to the flood protection needs of the area and develop plans for the replacement of the existing wall. In addition, this project will address the concrete sections of the Franklinton Floodwall where deficiencies such as spalling and cracking have occurred and which need patch repairs.
Anticipated RFP advertisement: 1/25/2027 (approximate).
Division: Storm Sewer · Capital Improvement Project (CIP) 611708-100000.
Listed in the Columbus Water & Power Contractor Connection Program — email CONNECT2CWP@columbus.gov to connect.
The project will investigate and evaluate the existing wall and levee system regarding the flood protection needs of the area and develop plans for the replacement of the existing wall. It will also address concrete sections of the Franklinton Floodwall where deficiencies such as spalling and cracking have occurred and which need patch repairs.
Source: Columbus Water & Power (CIP 611708-100000), retrieved via the Columbus Water & Power Contractor Connection Program project listing. View the official posting , always confirm requirements and deadlines with the issuing agency.