The project includes abrasive blasting and recoating of interior and exterior of Ground Storage Tank No. 1, HPT No. 1, HPT No. 2, and all associated yard piping, and replacement of foundation sealant, roof vent, roof access hatch, davit arm, interior ladder, overflow weir, roof rafters, roof plates, and cathodic protection system of Ground Storage Tank No. 1.
Type of work: Water Plant Ground Storage Tank Rehab
Pre-bid meeting: October 9, 2026 at 10:00 AM (Chicago) — For Access to the Pre-Bid teleconference, dial (605) 313-5550, and use access code: 3141507. — The Pre-Bid is not mandatory.
Bid opening: October 16, 2026 at 10:00 AM (Chicago) — Civcast eBidding — For Access to the Bid Opening teleconference, dial (605) 313-5550, and use access code: 3141507.
Questions due: October 14, 2026 at 10:00 AM (Chicago)
Questions asked: 14
Bid documents (download requires a free CivCast account):
The project includes abrasive blasting and recoating of interior and exterior of Ground Storage Tank No. 1, HPT No. 1, HPT No. 2, and all associated yard piping, and replacement of foundation sealant, roof vent, roof access hatch, davit arm, interior ladder, overflow weir, roof rafters, roof plates, and cathodic protection system of Ground Storage Tank No. 1.
We post new exterior cleaning opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p><span style=\"color: rgb(13, 13, 13);\">Contractor is to remove exterior cage, install safety climb fall arrest system, and install lockable ladder door. </span></p>""af1e6f8c-ec7d-45f0-8035-40b8dc107076""2026-10-07T19:02:31.008Z"false"<p>Rafters are c-channel. Dimensions will need to be verified by contractor. </p>""54e104e0-5d8e-41f7-9223-35f7c3c2dab4""2026-10-09T14:36:51.318Z"false"<p><span style=\"color: rgb(13, 13, 13);\">Inspection report is not available. Site images will be uploaded to Civcast. </span></p>""03aa7aca-1ca1-49ef-936d-f1d32992099d""2026-10-07T19:02:45.635Z"false"<p>We are not anticipating replacement of roof support structure. No mid span braces. </p>""f85a167a-c429-4f2d-83a0-7a4ec0d6938b""2026-10-09T14:37:04.165Z"false"<p>Only piping connected to the GST is to be blasted and coated. </p>""0de6b6e3-fed0-47a8-8367-9d2ccd5c6ff4""2026-10-09T14:37:19.448Z"false"<p>No logos will need to be replaced. </p>""81d062a0-832c-4344-a060-5cfc9a373308""2026-10-08T21:22:26.816Z"false"<p>Tanks were constructed in 2003. Existing coating does not contain lead. </p>""faf6b1e6-4e6e-4f66-a24e-cd7b92bd815e""2026-10-09T14:37:37.063Z"false"<p>IDS representative will be onsite daily or as needed for inspection and coordination. </p>""a63754f0-af11-4ddc-b383-9bcafe5076d2""2026-10-08T21:23:24.369Z"false"<p>January/February 2027</p>""c3213ff4-85a4-42eb-bbfc-e00c2a5c24ce""2026-10-08T21:23:39.59Z"false"<p>District will be responsible for maintaining system pressure while HPT is down for rehab. </p>""9e4599cb-f4bd-440d-b5a1-fc7f6fcb4d8c""2026-10-09T14:37:53.001Z"false"<p>January/February 2027</p>""d6116713-2f29-454f-9e0b-eee66eb0d64b""2026-10-08T21:24:10.247Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abec6926221683a23aee0f2), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.