The Contractor shall install 8-inch and 12-inch C900/C909 PVC water mains (with sand bedding and electrically continuous tracer wire and access points) along Helmsman Rd/Stuart Rd, Lavernia Rd/Mt. Olive Rd, Texas Loop 106/Stuart Rd, and Kirkner Rd, including specified tie-ins (cut-in tees with mechanical restraints), bends, reducers, gate valves (open-right, permanently marked), fire hydrants, air-release valves at high points, service relocations, and steel-encased bored/jacked/tunneled crossings or HDPE directional drilling where shown
Type of work: Water Utility, Water Pipe Replacement
Engineer's estimate: 1,400,000
Bid opening: October 13, 2026 at 10:00 AM (Chicago) — ECSUD Office 12452 E US Highway 87, Adkins Texas 78101
Questions asked: 8
Bid documents (download requires a free CivCast account):
The Contractor shall install 8-inch and 12-inch C900/C909 PVC water mains (with sand bedding and electrically continuous tracer wire and access points) along Helmsman Rd/Stuart Rd, Lavernia Rd/Mt. Olive Rd, Texas Loop 106/Stuart Rd, and Kirkner Rd, including specified tie-ins (cut-in tees with mechanical restraints), bends, reducers, gate valves (open-right, permanently marked), fire hydrants, air-release valves at high points, service relocations, and steel-encased bored/jacked/tunneled crossings or HDPE directional drilling where shown.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>This will be allowed but the HDPE utilized should have the diameter of the pipe segment in the ID not OD.</p>""47e57ef1-5290-4afa-b851-ab471e650f45""2026-09-28T18:00:37.743Z"false"<p><span style=\"background-color: rgb(0, 0, 0); color: rgb(231, 233, 234);\">Per General Conditions GC6.11 (Samples and Tests):</span></p><ul><li><span style=\"background-color: rgb(0, 0, 0); color: rgb(231, 233, 234);\">Contractor pays for tests to determine fitness/preliminary approval of materials and for concrete mix design.</span></li><li><span style=\"background-color: rgb(0, 0, 0); color: rgb(231, 233, 234);\">Owner pays for tests used for actual control of the work, including soil compaction tests (density tests) and concrete compressive strength tests.</span></li></ul><p></p>""2e7454a0-423e-4078-ac66-dfad4758a946""2026-09-28T20:04:10.508Z"false"<p>This will be permitted.</p>""ffba332f-1d1b-4387-8d84-dad891b62509""2026-09-28T18:09:37.833Z"false"<p>Bedding is required, can be either type.</p>""93f718cc-8680-4681-ad4f-1ddde1551abb""2026-10-05T20:36:24.577Z"false"<p>See addendum plans, should not be necessary.</p>""d90383de-2839-4c0d-a321-1536b8cda09e""2026-10-05T20:36:50.512Z"false"<p>No</p>""d286b6b5-3e1e-4068-9ce2-96ad392fcace""2026-10-05T20:36:58.338Z"false"<p>See addendum plans, should be clearer now.</p>""d8b44897-50e2-4481-9243-e66015ea1afd""2026-10-05T20:37:24.47Z"false"<p>See addendum plans, should be clearer now.</p>""0b15b552-8239-4a59-9931-7fb40ea5e398""2026-10-05T20:37:51.259Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab850941160102ba9e2cb72), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.