Installation of a packaged fiberglass lift station system, including wet well, buried valve vault, pumps, jib crane, electrical equipment, and all piping, valving, and appurtenances for a complete and working system.
Bid opening: October 13, 2026 at 2:00 PM (Chicago) — Kimley-Horn 260 East Davis Street, Suite 100 McKinney, TX 75069
Questions asked: 24
Bid documents (download requires a free CivCast account):
Installation of a packaged fiberglass lift station system, including wet well, buried valve vault, pumps, jib crane, electrical equipment, and all piping, valving, and appurtenances for a complete and working system.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>A specification will not be provided for the odor control system. Odor control unit shall be 2050-50-SA Odor Control System by Wager Company or approved equal.</p>""4cf0ece2-1d54-48b9-aead-d22394350231""2026-09-29T17:43:23.358Z"false"<p>Allowable submersible pumps include Sulzer and KSB. No equals will be considered at this time.</p>""881ac004-3815-43b7-989d-e1e0c31ef116""2026-09-29T17:43:27.51Z"false"<p>The wet well and valve vault are fiberglass structures. Interior concrete coating systems are not applicable to this project.</p>""840b31d2-515b-4203-ab6f-c6d1a28d3060""2026-09-29T17:43:29.604Z"false"<p>The geotech report will be included with Addendum No. 1. Addendum No. 1 is anticipated 09/29/2026.</p>""f935b0f9-4b7a-42fa-8254-812fcc8f45d4""2026-09-29T17:43:31.855Z"false"<p>If a precast base can be cast in shop conditions and the structure meets the engineer's designed buoyancy criteria, provides signed and sealed plans and calculations, then a precast base will be permitted. The contractor shall bid the project based on the bid documents provided.</p>""ab74b0a4-6875-4787-810e-a083252ee440""2026-09-29T17:43:36.111Z"false"<p>Shoring use is optional and is shown as a method of installation. If shoring is used, the contractor shall submit signed and sealed drawings and calculations for engineer review prior to installation. </p>""07914469-e6de-47e8-aa78-49a46e12c7e0""2026-09-29T17:43:38.248Z"false"<p>The geotech report will be included with Addendum No. 1. Addendum No. 1 is anticipated 09/29/2026.</p>""eda8fcf0-0c40-448b-a08e-89885c4d2166""2026-09-29T17:43:40.112Z"false"<p>Refer to General Conditions of the Contract, Section 4.02 of the bid documents for Construction Surveying requirements.</p>""ed260ebd-0dec-437e-87df-a596cd9561e5""2026-09-29T17:43:41.94Z"false"<p>Refer to General Conditions of the Contract, Section 8.01 of the bid documents for CMT Lab Services requirements.</p>""e8cb0a10-0748-4296-aa1f-a8bb90c81dcb""2026-09-29T17:43:44.269Z"false"<p>The nearest water source during construction is owned by Mustang SUD. Contractor shall coordinate with Mustang SUD as needed and determine current water availability/restrictions. Information is currently available at the following link: <a href=\"https://www.mustangwater.com/irrigation-watering-schedule\" rel=\"noopener noreferrer\" target=\"_blank\">https://www.mustangwater.com/irrigation-watering-schedule</a></p>""0f93c68e-e719-4163-9e92-d0a247a864d8""2026-09-29T17:43:46.788Z"false"<p>Contractor shall meet the delegated design requirements indicated in the plans and bid documents. Refer to Sheet S-100 for delegated design notes and applicable systems. Additionally, the electrical cover awning is also a delegated structural design.</p>""8ed51607-c2b5-405b-ab14-19f72f195e1b""2026-09-29T17:43:48.925Z"false"<p>The geotech report will be included with Addendum No. 1. Addendum No. 1 is anticipated 09/29/2026.</p>""437748fa-9e0c-4093-8b80-9538642ce845""2026-09-29T17:43:50.712Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Allowable submersible pumps include Sulzer and KSB.</span></p>""66120039-f038-46bc-8498-a380ab7adb64""2026-09-29T17:49:02.431Z"false"<p>6" ductile iron P401 lined discharge pipe and fittings shall be acceptable for the wet well and valve vault.</p>""e8d8f347-b90e-4360-99e5-fb6a1dd3bf97""2026-10-05T22:06:29.525Z"false"<p>The security wall and security gate are included in the scope of this project.</p>""c50814e9-b036-407e-8237-31454602dd82""2026-10-05T22:06:33.826Z"false"<p>Allowable submersible pumps include Sulzer and KSB. No equals will be considered at this time.</p>""b528821b-fba9-46cd-b2c4-631281dd8a46""2026-10-05T22:06:35.757Z"false"<p>See note 16 on sheet M-101 for crane model number information. Crane actuator shall be electric winch configuration with 6' pendant control.</p>""45ff65f3-a694-4967-90c3-9614f1698f52""2026-10-05T22:06:37.443Z"false"<p>No.</p>""642dd094-bbb1-4200-8119-0a957503eb75""2026-10-05T22:06:39.138Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Allowable generator manufacturers shall be </span>cummins, kohler, caterpillar, or MTU<span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">. No equals will be considered at this time.</span></p>""4758445f-08e4-46e9-8780-624cde6b8be3""2026-10-07T14:55:17.935Z"false"<p><span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">Allowable generator manufacturers shall be </span>cummins, kohler, caterpillar, or MTU<span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">. No equals will be considered at this time.</span></p>""65ef4258-dc11-4835-852b-6ee0a27188d5""2026-10-07T14:55:19.851Z"false"<p><span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">Allowable generator manufacturers shall be </span>cummins, kohler, caterpillar, or MTU<span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">. No equals will be considered at this time.</span></p>""c3743c09-0da1-4347-9bc7-44a1679920a3""2026-10-07T14:55:22.326Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab6772e0158b61039f5e25a), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.