A. Site Preparation, Importing, Spreading, and Compacting Fill.
B. Construction of 1.8 MGD Wastewater Treatment Plant.
C. Construction of Two-Story Operations Building.
D. Construction of Electrical Improvements.
E. Installation of Off-Site Waterline F. Startup and Testing of Wastewater Treatment Plant.
G. Demolition of Existing Steel Wastewater Treatment Plant and Associated Equipment H. Construction of Mitigation Basin.
I. Testing of Constructed Facilities.
J. Site Clean up and Restoration
Type of work: The project includes the construction of a 1.8 MGD sequencing batch reactor wastewater treatment plant (membrane bioreactor alternate bid), including all equipment, piping, site work, excavation and drainage improvements, electrical improvements, operations building, and demolition of existing package wastewater treatment plant and equipment.
Pre-bid meeting: October 2, 2026 at 10:00 AM (Chicago) — 25810 Gosling Road Spring, Texas 77389 — The Pre-bid meeting is NOT mandatory.
Bid opening: October 16, 2026 at 10:00 AM (Chicago) — Civcast eBidding — For Access to the bid opening teleconference, dial (605) 313-5660, and use access code: 6184643.
Questions due: October 12, 2026 at 10:00 AM (Chicago)
Questions asked: 42
Bid documents (download requires a free CivCast account):
The project includes site preparation, importing, spreading, and compacting fill; construction of a 1.8 MGD wastewater treatment plant; construction of a two-story operations building; construction of electrical improvements; installation of an off-site waterline; startup and testing of the wastewater treatment plant; demolition of the existing steel wastewater treatment plant and associated equipment; construction of a mitigation basin; testing of constructed facilities; and site cleanup and restoration.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>It has been uploaded.</p>""19c71f66-e35c-4a6f-b2e8-c972ef5f6baf""2026-09-25T13:18:55.116Z"false"<p>The bid date will be moved as needed to allow for sufficient bid preparation time.</p>""0d686998-5281-419b-ae88-310982f9bb5f""2026-09-28T20:07:34.647Z"false"<p>The bid date will be moved as needed to allow for sufficient bid preparation time.</p>""8a652214-8188-473f-b792-3222a29d151d""2026-09-28T20:07:38.27Z"false"<p>The bid date will be moved as needed to allow for sufficient bid preparation time.</p>""59849275-afad-44c4-8d10-7caac3c143f3""2026-09-28T20:07:41.2Z"false"<p>Yes, all office building associated electrical work should be included under item #26 unless explicitly stated otherwise, such as the MCC equipment in item #24.</p>""48f6c624-de6d-4313-8f5a-2449e9d7ecc0""2026-10-01T13:43:11.399Z"false"<p>4” x 4” x 15’ square aluminum poles. </p>""3484cb38-db71-4d57-b624-a73a6d115a05""2026-10-01T14:57:09.639Z"false"<p>The lower headworks layout on E-13 applies to both the base bid and the alt bid. On the E-25 site layout, the E-12 call will be revised to E-13.</p>""1fe0b688-19c5-41b4-864c-21a7104774f3""2026-10-01T15:33:07.109Z"false"<p>Quorum will coordinate, procure, and install all interior finishes and furnishes not otherwise called for in the plans including audio and visual components. All items shown on the plans and described in the specifications will be provided and installed by the GC unless marked as “By Owner”.</p>""389bcc94-8ff9-4584-980d-f3c2c81917d7""2026-10-07T15:15:35.459Z"false"<p>All items scheduled for demolition will become property of the contractor, including all onsite steel basins. Demolition and salvage shall be as described in Section 01110 Summary of Work and Section 02050 Demolition.</p>""5d4064f7-06c2-4dab-934f-48babc6afc33""2026-10-09T13:09:39.142Z"false"<p>It has been uploaded.</p>""b2bdc45d-cfdf-4b50-ad59-ee2f57cf5b63""2026-10-06T18:53:08.195Z"false"<p>Disc membrane diffusers as described in the specifications shall be installed. The listed approved manufacturer list on C-6 will remain the same.</p>""0e2b340f-86b9-4576-8d0d-69d4299194a7""2026-10-09T13:10:02.578Z"false"<p>Basin cleanout and sludge/grit removal will be completed by the District’s Operator.</p>""a0d6595d-c8be-45fb-bfcd-059c7951e408""2026-10-09T13:10:17.15Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab546b1f51e50735b804433), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.