PROJECT SCOPE OF WORK – FM 359 BUILDING 1 Tekton Construction and Development Partners is requesting subcontractor proposals for the construction of FM 359 Building 1 in Fulshear, Texas. Pricing shall include all labor, materials, equipment, supervision, transportation, installation, testing, coordination, and incidentals necessary to complete the applicable trade scope in accordance with the provided drawings and bid documents.
Civil Scope: Site demolition and clearing, SWPPP/erosion control, earthwork and grading, subgrade preparation, concrete paving, driveways, curbs, sidewalks, storm sewer and drainage, detention pond, stormwater pump system, water/fire utilities, sanitary sewer, retaining-wall coordination, TxDOT/ROW work, traffic control, testing, restoration, and site closeout.
Architectural Scope: Shell-building architectural work including metal stud framing, exterior wall systems, stucco, split-face CMU, brick veneer, corrugated metal panels, wood-look panels, storefront glazing, exterior doors and hardware, TPO roofing, standing-seam metal roofing, parapets, towers, canopies, soffits, weather barriers, flashing, sealants, fire-rated assemblies, firestopping, accessibility items, blocking, finishes, and related architectural work.
Structural Scope: Building pad preparation, excavation, structural fill and compaction, drilled/underreamed pier foundations, reinforced-concrete grade beams, slab-on-grade, vapor barrier, reinforcing steel, concrete placement, construction joints and dowels, anchor rods, base plates, structural steel, welding, non-shrink grout, testing, inspections, shop drawings, and structural coordination.
Electrical Scope: Electrical utility/service coordination, transformer and service equipment, electrical panels, underground conduits and wiring, site lighting, canopy lighting, wall packs, building lighting, emergency/exit lighting, receptacles, equipment connections, grounding/bonding, telephone/data conduits, lighting controls, firestopping, testing, labeling, and electrical closeout.
Plumbing Scope: Sanitary sewer, grease-waste piping, grease interceptor and sample well, domestic water, fire-water service coordination, hose bibbs, waste and vent piping, floor drains and floor sinks, cleanouts, plumbing fixtures, water heater and hot-water system, backflow prevention, gas piping, pipe insulation, supports/hangers, sleeves and penetrations, testing, disinfection, inspections, and plumbing closeout.
Bid Requirement: Current pricing request is for Building 1 only. Buildings 2 and 3 are excluded from the shell-building scope unless specifically requested. Civil/site work shall be priced in accordance with the provided civil drawings and bid instructions.
Subcontractors shall review the complete drawing set and applicable details for their respective trade and include all work necessary for a complete installation. Clearly identify all exclusions, qualifications, alternates, lead times, schedule requirements, and proposed substitutions with the bid. Any discrepancies, missing information, or scope questions shall be submitted toTekton Construction and Development Partners for clarification prior to proposal submission.
Type of work: Commercial Shell Building – Civil, Architectural, Structural, Electrical & Plumbing Construction
Bid opening: October 15, 2026 at 6:00 PM (Chicago) — Submit bids electronically to bids@ss-engg.com — Please submit your proposal with complete scope, pricing, exclusions, alternates, lead times, schedule duration, and proposal validity. Clearly identify any items not included in your price.
Questions asked: 5
Pricing is requested for FM 359 Building 1 only, unless otherwise noted. Bidders shall review all provided Civil, Architectural, Structural, Electrical, and Plumbing drawings, details, schedules, and notes applicable to their scope. Verify dimensions, quantities, existing conditions, and utility connections before submitting pricing. Do not scale drawings. Any discrepancies, missing information, or conflicts between drawings shall be submitted to Tekton Construction and Development Partners for clarification before bidding. Clearly identify all exclusions, qualifications, and assumptions in the proposal. Any issued revisions or addenda shall supersede previous drawings.
Bid documents (download requires a free CivCast account):
Work includes civil site demolition, SWPPP, earthwork, concrete paving, driveways, curbs, sidewalks, storm sewer, detention pond, stormwater pump system, water/fire utilities, sanitary sewer, TxDOT/ROW work and site closeout; architectural shell including framing, exterior wall systems, stucco, CMU, brick, metal panels, storefront glazing, doors, TPO and metal roofing, towers, canopies and firestopping; structural pad preparation, drilled/underreamed piers, grade beams, slab-on-grade, reinforcing and structural steel; electrical service, panels, site and building lighting, receptacles, grounding, telephone/data conduits and controls; and plumbing sanitary, grease-waste, interceptor, domestic and fire-water, fixtures, water heater, backflow, gas piping, testing and closeout in accordance with the provided drawings.
We post new concrete opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Hi Tyler,</p><p></p><p>The <strong>Geotechnical Report has just been uploaded to the Bid Documents section</strong> for your review.</p><p>Please let me know if you have any trouble accessing it.</p><p></p><p>Thank you.</p>""2b551b62-56fa-4525-b6a5-b44aabba9019""2026-09-25T13:59:15.386Z"false"<p>No, I did not see an estimated project value listed in the bid documents.</p>""0de4a231-0e18-49e2-820f-fa9dc6bfc19e""2026-09-29T14:58:32.344Z"false"<p>Hi Arsalan,</p><p></p><p>For this current pricing request, a <strong>Bid Bond is not required</strong>.</p><p>Please let us know if you have any other questions.</p><p></p><p>Thank you,</p><p>Venkat</p>""31d365ae-0060-4282-9330-a719e95d3d89""2026-10-01T14:04:04.145Z"false"<p>Hi Julio,</p><p></p><p>Thank you for your question. The subcontractor payment terms, including progress billing, payment period, retainage, and billing for stored or specially fabricated materials, are currently being confirmed with the Owner/GC. We will provide the applicable terms once finalized.</p>""65861188-21bc-46d9-ae09-afd7a828f5a5""2026-10-05T02:57:28.392Z"false"<p>Hi <span style=\"background-color: rgb(255, 255, 255); color: rgb(95, 99, 104);\">Jeannette Olguin</span></p><p></p><p>We are currently in the bidding/proposal stage for the FM 359 Medical Office Shell – Building 1 project and are actively soliciting subcontractor pricing. The construction scopes have not been awarded yet. Please feel free to submit your proposal or reach out with any scope questions.</p><p> </p><p></p>""4944f986-22fb-457e-8266-4516d79fc389""2026-10-09T21:33:21.087Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.