The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct the proposed headworks replacement consist of modifications to the 14” and 10” onsite force mains, impeller replacement to Lift Station B, piping modifications to the 18” screened influent lines going into main process unit no. 1 and package plants and modifications to the onsite NPW system. Additional items include onsite drainage system modifications, miscellaneous electrical items for proposed headworks and driveway modifications.
Engineer's estimate: $5.5M
Pre-bid meeting: October 13, 2026 at 10:00 AM (Chicago)
Bid opening: October 20, 2026 at 2:00 PM (Chicago) — 1575 Sawdust Road, Suite 400, The Woodlands, Texas 77380
Questions due: October 14, 2026 at 2:00 PM (Chicago)
Questions asked: 7
Bid documents (download requires a free CivCast account):
The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct the proposed headworks replacement, including modifications to the 14” and 10” onsite force mains, impeller replacement to Lift Station B, piping modifications to the 18” screened influent lines going into main process unit no. 1 and package plants, modifications to the onsite NPW system, onsite drainage system modifications, miscellaneous electrical items for proposed headworks, and driveway modifications.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>A cost estimate will not be posted for this project.</p>""0e8af29b-b785-4d87-b88d-818ca73ba32e""2026-09-28T14:10:28.195Z"false"<p>All pull gates shall be CE per plans. The specs will be updated in an addendum.</p>""fd576e57-3f44-4d15-a152-5c8eccd9ceca""2026-09-29T12:58:55.523Z"false"<p>The channel depth is 6 feet, and the downstream depth is 1.15 feet at peak flow per the plans. The specs will be updated in an addendum.</p>""89e91040-c4f1-4894-983d-af4f9b494bc5""2026-10-06T16:21:31.785Z"false"<p>The process control narrative should refer to Specification 11120 - Horizontal End Suction Centrifugal Pump. The specs will be updated in an addendum.</p>""37b8e0c6-c3d8-4424-8504-066a40764050""2026-10-06T16:22:06.271Z"false"<p>Please refer to Sheet 2-I-1 for clarity. The contractor shall provide two (2) screens and two (2) washer compactors per the plans. The specs will be updated in an addendum.</p>""0f287785-79ee-4a34-a3c4-6d899a0bbb3c""2026-10-06T16:22:23.142Z"false"<p>The screen panels and discharge chute should be listed as type 316 stainless steel in Specification 11221 - Perforated Plate Screen. All wetted and structural components of the washer compactor should be listed as type 316 stainless steel in Specification 11700 - Screenings Washer Compactor. The specs will be updated in an addendum.</p>""3ab770a0-9ca7-4624-860f-6ccc311d740e""2026-10-09T14:46:00.113Z"false"<p>Two booster pumps are required total (1 duty, 1 spare). Refer to Specification 13441 - Process Control Narratives for clarity.</p>""cdad4f0d-dd5c-49b7-9cf0-2271c3bd1552""2026-10-09T14:43:21.475Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab3d19263213bfe890094ea), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.