This project generally includes approximately 2,100 LF of 8” water line improvements, 3,900 LF of 8” sanitary sewer improvements, 2,100 LF of paving improvements, and 520 LF of storm drain improvements along Perry Avenue from N Getzendaner Street to Graham Street.
Type of work: Steet Reconstruction, pavement, concrete, sidewalks, water main line, wastewater main line, storm drain
Pre-bid meeting: September 29, 2026 at 2:00 PM (Chicago) — Microsoft Teams (https://tinyurl.com/PerrryPreBid) — The pre-bid meeting will be held via Microsoft Teams (https://tinyurl.com/PerrryPreBid), prebid meeting ID will be: 233 421 387 295 945, and the passcode will be: xL9Dc6Em, dial in by phone: +1 469-998-7643, 527260304#.
Bid opening: October 15, 2026 at 3:00 PM (Chicago) — 2nd floor Public Works/Utility receptionist of the Charles Beatty Municipal building 408 S. Rogers St, Waxahachie, TX 75165
Questions asked: 10
Bid documents (download requires a free CivCast account):
This project generally includes approximately 2,100 LF of 8” water line improvements, 3,900 LF of 8” sanitary sewer improvements, 2,100 LF of paving improvements, and 520 LF of storm drain improvements along Perry Avenue from N Getzendaner Street to Graham Street.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>An engineer’s estimate is not available for this project.</p>""21dd5edd-92a6-448f-b3da-d3b91239d96d""2026-09-21T00:55:43.449Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">The City pays for construction material testing. In the event that the contractor needs to reschedule testing, the contractor may be required to cover costs for cancellations or failed tests.</span></p>""932e6c0c-6147-472a-8953-50448d63ba95""2026-09-21T01:00:01.012Z"false"<p>The City pays for water used for construction.</p>""70c2d1ef-aa0e-49e8-92a3-a0b416983776""2026-09-21T01:00:46.11Z"false"<p>Anticipated start date is January 2027.</p>""d7763712-811e-4330-9733-cb03ac036357""2026-09-21T01:02:20.99Z"false"<p>Franchise Utilities such as Atmos have finished their relocation.</p>""3d042c33-76b6-4df2-a635-aa6550821462""2026-09-21T01:03:29.427Z"false"<p>Not at this time. Contractors may mail in their packets as long as they arrive prior to bid date and time.</p>""6ba572fa-cd10-49a5-a0f3-578af593355d""2026-09-25T19:59:58.974Z"false"<p>See Addendum 2. Embedment detail has been added. Plans have been updated for clarity. All underground utility and storm pipe to be embedded with crushed rock per City of Waxahachie standard details as shown in the updated Addendum No. 2 plan sheets. Backfill for all trenches shall be acceptable native soil or select fill as shown in the details. At the discretion of the City, full depth trench backfill – from top of embedment to subgrade - shall be flowable fill as alternately bid. </p>""87a8e9c0-ddf5-4112-a026-de4c711db2ac""2026-10-09T22:38:11.709Z"false"<p>Concrete repair shall follow typical concrete pavement section detail shown on Sheet 3 of the construction documents. Panels shall be tied to adjoining existing concrete with #4 deformed tie bars @ 18” C/C unless otherwise directed in the field by the City. </p>""9fd3d782-64fd-491b-a8ab-b0fc63b82609""2026-10-09T22:38:26.394Z"false"<p>See Addendum 2. Plans have been updated for clarity. All underground utility and storm pipe to be embedded with crushed rock per City of Waxahachie standard details as shown in the updated Addendum No. 2 plan sheets. Backfill for all trenches shall be acceptable native soil or select fill as shown in the details. At the discretion of the City, full depth trench backfill – from top of embedment to subgrade - shall be flowable fill as alternately bid. </p>""5a7a1da4-ac6a-4307-8e71-91b96c322538""2026-10-09T22:39:10.066Z"false"<p>Contractor should anticipate bedrock at an approximate depth of 5 feet. Cost for excavation of all material and rock shall be included in price bid for various items and no compensation for varying subsurface conditions will be provided. </p>""004cad57-49a7-49f8-a400-ae1cd1958541""2026-10-09T22:39:18.399Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.