Type of work: Construction
Engineer's estimate: $23,000,000
Pre-bid meeting: October 2, 2026 at 9:00 AM (Chicago)
Bid opening: November 5, 2026 at 2:00 PM (Chicago)
Questions due: October 15, 2026 at 12:00 PM (Chicago)
Questions asked: 72
Bid documents (download requires a free CivCast account):
The project consists of the expansion of the City of Aledo Wastewater Treatment Plant from 0.6 MGD to 1.2 MGD. Major improvements include new sequencing batch reactor basins, influent lift station upgrades, screening improvements, post-equalization basin and pumps, cloth media filters, UV disinfection, chemical feed facilities, sludge holding tank, solids dewatering improvements, electrical facilities, SCADA improvements, site civil work, yard piping, plant water system improvements, maintenance building expansion, and associated site, structural, mechanical, electrical, instrumentation, and architectural work.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Refer to Addendum 01 Section 01 29 01 "Measurement and Basis for Payment" language</p><p></p>""82540115-8677-4215-9e5c-322bc1281716""2026-09-25T21:38:56.269Z"false"<p>Section 26 05 73 “Power System Study” has been included and references to it have been updated with Addendum 1</p>""ae62b51c-4cee-4a7b-a36a-bea02dc07005""2026-10-08T18:57:47.844Z"false"<p>Section 26 05 53 is correct for “Identification for Electrical Systems”; the footer will be corrected in an upcoming addendum</p>""697c73d6-2f87-4b51-bf64-d1b3d772f261""2026-10-08T18:58:06.722Z"false"<p><span style=\"color: black;\">The "Owner Approved PCSI" option identified in Specification Section 40 61 13 Paragraph 1.06.A.2(d) is available for this Project.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> A firm seeking approval as an additional PCSI shall submit documentation demonstrating qualifications, experience, resources, and successful completion of projects of similar size and complexity. The request shall be submitted through the Procurement Portal as a question or substitution request addressed to the Engineer and Owner for review.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> Requests for approval of an additional PCSI will be evaluated based on the firm's demonstrated experience with water and wastewater SCADA systems, personnel qualifications, project references, system integration capabilities, and ability to meet the requirements of the Contract Documents.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> A request for approval of an additional PCSI shall be considered a request for approval of an alternate to the pre-qualified list identified in Section 40 61 13. Accordingly, the requirements of Section 00 21 13, Article 7.02 apply. Requests must be submitted within the time period specified therein to allow sufficient time for review and issuance of any required clarification or addendum prior to receipt of bids.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> Approved additional PCSIs, if any, will be identified by Addendum. No PCSI shall be considered approved unless specifically identified by Addendum.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> The list of PCSIs included in the Contract Documents was developed based on the Owner's experience with firms having successfully completed similar SCADA integration projects. The inclusion of an Owner approval process provides a mechanism for consideration of additional qualified firms where sufficient supporting information is provided.</span></p><p></p>""00854b9f-aacc-4994-b50e-4bf6a38974a0""2026-10-01T14:24:30.76Z"false"<p><span style=\"color: black;\">For this Project, "project area" shall be defined as within a 50-mile radius of the Project site.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> This requirement may be satisfied by the combined capabilities of the Contractor's team. However, each subcontractor performing instrumentation, controls, SCADA, system integration, startup, commissioning, or related I&C work shall have qualified technicians located within the project area for the duration of its Work. The Contractor shall remain responsible for compliance with this requirement.</span></p>""93f16e7c-e1e3-4ee5-b1ef-0e5f9ed0de7d""2026-10-01T14:25:35.91Z"false"<p><span style=\"color: black;\">The Contract will be awarded to the Prime Contractor. Within one week of Notice to Proceed, the Prime Contractor shall submit the qualifications of its selected PCSI for review in accordance with Section 40 61 13.</span></p><p><span style=\"color: black;\"> </span></p><p><span style=\"color: black;\"> The proposed PCSI is not a basis for determining bid responsiveness. However, the submitted PCSI must meet the requirements of the Contract Documents. If the proposed PCSI is determined not to meet the specified qualifications, the Prime Contractor shall provide a qualified replacement PCSI at no additional cost to the Owner and with no adjustment to the Contract Price or Contract Times.</span></p>""142487b1-fc2e-4b25-af5c-f3b3b14a8694""2026-10-01T14:26:41.8Z"false"<p>Refer to Addendum 01 and added Section 00 73 46 "Wage Determination Schedule."</p><p></p>""bb69168c-e633-452c-83f7-d78ad3cb9079""2026-09-25T21:39:20.583Z"false"<p>The pre-bid conference is non-mandatory. Refer to Addendum 01 that clarifies Section 00 21 13.</p><p></p>""a5ab4263-2f76-4d46-9701-09626e76edd5""2026-09-25T21:39:47.63Z"false"<p> A tour of the Site will be held immediately after the pre-bid conference. Prospective Offers attending the site tour are required to arrange their own transportation to the Site. Address and directions to the Site will be available at the pre-bid conference. Refer to Addendum 01.</p><p></p>""33b426db-d4a5-413e-a904-91bd04fd64df""2026-09-25T21:40:30.27Z"false"<p>The deadline for questions is 12:00 pm on 10/15/2026. Refer to Addendum 01. </p><p></p>""2b49acb8-338c-43d9-9a77-816d143d625b""2026-09-25T21:40:50.778Z"false"<p>Freese and Nichols, Inc. is the Construction Manager. Refer to Section 00 52 13 "Agreement."</p><p></p>""5c6c3ccc-c92b-43c4-a464-62f3814c12e5""2026-09-25T21:41:00.872Z"false"<p> The Project advertisement date was September 21, 2026, through www.civcastusa.com and local newspaper publications. </p><p></p>""a59457b7-c148-4bab-b51b-ec4f2034a4f1""2026-09-25T21:41:28.791Z"false"<p>This question appears to be duplicate of previous questions. </p><p></p><p></p>""5c55e4d1-b4cc-4bb2-9be3-f462eb92211a""2026-09-25T21:42:07.998Z"false"<p>This procurement is a competitive low-bid procurement. The Owner intends to award the Contract to the lowest responsible Offeror in accordance with Sections 00 11 16 and 00 21 13. The Qualifications Statement required by Section 00 45 13 will be used to evaluate the responsibility and qualifications of the apparent low Offeror and is not subject to a weighted or point-based scoring system. </p>""3dcca888-d912-4875-9079-21e0c6dfc65d""2026-10-01T14:32:33.246Z"false"<p>1. That is correct, E-11 shows the recommended routing for duct banks. </p><p>2. SWB-01P is correct; Sheets E-26 and E-28 will be corrected in an upcoming addendum.</p><p>3. Duct Banks are to be run with minimum 2" conduits however sheet E-40 will be updated to show correct conduit sizes for conduits that should be larger in an upcoming</p><p>addendum.</p><p></p>""6c3e2d72-23ec-470a-980f-c24a11225d3c""2026-10-08T18:59:14.17Z"false"<p><strong><em>The 18" SE from the post-eq basin to the filters has a tee with a blind flange. Refer to notes on SBR-M4, remove blind flange and connect to 18" tee for new 18-SE-DI from post-eq basin. </em></strong></p>""5a0480d4-21aa-4cbe-8477-1b90d3d05b82""2026-10-06T16:04:00.842Z"false"<p><strong style=\"color: black;\"><em>Drawing AB-P2 is correct with a 3" main truck line from the admin building. Drawing C-5 will be updated in a forthcoming addendum.</em></strong></p>""7ad3731b-409d-455a-b7bf-97611c70d362""2026-10-06T16:17:48.636Z"false"<p><strong style=\"color: black;\"><em>Pipe penetration on Drawing SB-M7 Section 7 will be corrected to Detail 342, Type D. Refer to forthcoming addendum.</em></strong><span style=\"color: black;\"> </span></p>""4972e430-348a-4dfd-b823-09789a158ee1""2026-10-06T17:37:20.953Z"false"<p>The project will be 1,000 days to Substantial Completion and 60 days to Final Completion. Refer to forthcoming addendum with clarifications.</p>""c9bead8a-56bc-4e1c-9433-4c4a304c88de""2026-10-01T14:33:35.093Z"false"<p>The City will bring the project to the December Council Meeting. Documentation will then be issued to Texas Water Development Board for approval to issue Notice to Proceed. </p>""942bd4c2-8ba8-4bc8-bf6f-47e23b3ff3c0""2026-10-05T19:29:58.555Z"false"<p>Refer to Addendum 01. Site visit will be held immediately after the pre-bid conference for prospective offerors/bidders. Your own transportation will need to be arranged. Address and directions will be available at the pre-bid. </p>""94020590-0e93-40b0-a337-a031f71507ed""2026-09-30T12:55:35.359Z"false"<p>Project bid date has been extended one week to November 5<sup>th</sup>. No additional extensions will be issued. Refer to Addendum 02. </p>""28ae8ee7-1dc7-490e-8d27-a44f05e35b4c""2026-10-05T19:30:23.889Z"false"<p>Refer to Section 46 53 53, Paragraph 2.10</p>""9dc6486d-39ef-4956-90f8-b3621b2657b8""2026-10-08T19:58:57.951Z"false"<p>The project will be 1,000 days to Substantial Completion and 60 days to Final Completion. Refer to forthcoming addendum with clarifications.</p>""8794112f-1023-4132-a42d-618d02b53431""2026-10-01T19:17:35.685Z"false"<p>The City is in the processing of plugging the groundwater well. The well will be plugged by the time the project starts. City will share documentation when available. The existing 3-NPW-PVC piping will need to be demolished/capped from the groundwater well for the electrical building construction. </p>""03f787d0-d138-4a98-889f-15b01a4b3c94""2026-10-08T19:59:49.725Z"false"<p>Engineered Air will be a sole-sourced. A proposal and written in price will be issued by addendum with the bid form. </p><p></p>""c635abbb-4643-461b-aa2d-616b08362b51""2026-10-05T12:37:29.405Z"false"<p>Diaphragm metering pumps will not be acceptable</p>""e7b5a68e-099d-4721-a52e-623aeeef264e""2026-10-08T20:00:27.481Z"false"<p>Updated bid form will be issued in a forthcoming addendum, which will included corrected dates, allowances, and sole-source pricing</p>""998e69f5-faf5-40cc-b936-1ce465a3d8ca""2026-10-08T20:00:52.576Z"false"<p>Phoenix Contact Industrial ethernet is acceptable</p>""000e107a-8e5a-4b4f-8408-0b1c08d9e45e""2026-10-09T14:30:33.332Z"false"<p>PWTech standard three-phase monitor is acceptable</p>""ccc68d7d-3001-4462-87ba-57e4018c5b08""2026-10-09T14:30:04.344Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aad603c1a0be96dfd9d8ec2), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.