RCP Drainage Channels and Piping, Including Approximately 18”- 36” Pipe, 3’x2’ – 7’x3’ RCB, 18” – 48” HDPE Pipe, Box Manholes, Headwalls and Appurtenances; Water Piping Including 2” - 12” PVC Mains and Appurtenances; Gravity Wastewater Piping consisting of 8”-15 gravity PVC Pipe and Appurtenances; Forcemain Wastewater Piping consisting of 8” PVC mains, Two Wet Ponds; Excavation, Embankment, and Paving; Sedimentation & Erosion Control; TxDOT Improvements consisting of street widening and intersection signalization; Landscaping, Electrical Improvements, and Various Other Site Improvements.
Type of work: Water, Wastewater, Drainage, Paving, TxDOT improvements
Pre-bid meeting: September 24, 2026 at 11:00 AM (Chicago) — Microsoft Teams Meeting — Meeting ID: 261 928 065 058 472; Passcode:4hX6xR9V Call-In: 832-680-2579; Phone conference ID: 462 911 959#
Bid opening: October 15, 2026 at 3:00 PM (Chicago) — BGE Inc 101 W Louis Henna Blvd, Suite 400 Austin, TX 78728
Questions due: October 8, 2026 at 5:00 PM (Chicago)
Questions asked: 44
Bid documents (download requires a free CivCast account):
RCP Drainage Channels and Piping, Including Approximately 18”- 36” Pipe, 3’x2’ – 7’x3’ RCB, 18” – 48” HDPE Pipe, Box Manholes, Headwalls and Appurtenances; Water Piping Including 2” - 12” PVC Mains and Appurtenances; Gravity Wastewater Piping consisting of 8”-15 gravity PVC Pipe and Appurtenances; Forcemain Wastewater Piping consisting of 8” PVC mains, Two Wet Ponds; Excavation, Embankment, and Paving; Sedimentation & Erosion Control; TxDOT Improvements consisting of street widening and intersection signalization; Landscaping, Electrical Improvements, and Various Other Site Improvements.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No</p>""e415d3dd-8280-4cfe-b9ca-331943a463ad""2026-10-08T19:20:19.585Z"false"<p>Contractors are to price the pump specified in the plans. </p>""c8e4d0f8-6636-409d-8b2b-9bd5189d105b""2026-10-08T19:20:42.966Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Contractors are to price the pump specified in the plans.</span></p>""214dd0bf-c997-4900-a993-d53337c080ed""2026-10-08T19:20:59.362Z"false"<p>BGE will set lot pins. </p>""7fb731d2-4e68-4e81-8b43-cfbd8dc9b246""2026-10-08T20:13:40.297Z"false"<p>The project is in fill conditions and will not require a stockpile. </p>""870cd11b-be45-4f69-9924-3f4b791c5280""2026-10-08T20:14:34.314Z"false"<p>Yes. Final dry utility plans are not currently available. </p>""12454706-b6fb-4096-b169-c9d04a4d5be6""2026-10-08T20:15:12.623Z"false"<p>Yes</p>""cef1e27a-5f6a-4f15-a7fb-951b6d7533b8""2026-10-08T20:16:49.868Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aac64812833a847597844e4), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.