The project consists of Replacement of approximately 770 linear feet of existing 4-inch waterline with 8-inch HDPE waterline, including approximately 570 linear feet of waterline installed by trenchless methods beneath the existing lake.
The project includes all necessary waterline appurtenances, including encasement, and restoration of affected asphalt roadway and gravel drive areas.
Type of work: Waterline installation including trenchless methods and Minor pavement and driveway repair.
Engineer's estimate: $575,000
Pre-bid meeting: October 14, 2026 at 10:00 AM (Chicago) — District Office: 115 Hammer Rd., Mabank, Texas 75156 — Mandatory
Bid opening: October 28, 2026 at 3:00 PM (Chicago) — District Office: 115 Hammer Rd., Mabank, Texas 75156
Questions asked: 1
Please submit questions for this project through the Civcast Q&A portal 72 hours prior to bid opening.
Bid documents (download requires a free CivCast account):
The project consists of replacement of approximately 770 linear feet of existing 4-inch waterline with 8-inch HDPE waterline, including approximately 570 linear feet of waterline installed by trenchless methods beneath the existing lake. The project includes all necessary waterline appurtenances, including encasement, and restoration of affected asphalt roadway and gravel drive areas.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aac41d06879fa0b6c1bd235), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.