Drainage infrastructure, including Approximately 18”- 48” RCP, 6’x3’- 9’x5’ RCB, Box Manholes, Headwalls and Appurtenances; Water Piping Including 8”-12” PVC Mains and Appurtenances; Gravity Wastewater Piping consisting of 8” PVC Pipe and Appurtenances; Excavation, Embankment, and Paving; Sedimentation & Erosion Control; and Various Other Site Improvements.
Type of work: Water, Wastewater, Drainage and Paving
Pre-bid meeting: September 24, 2026 at 9:30 AM (Chicago) — Microsoft Teams Meeting — Meeting ID: 279 138 661 419 55 Passcode: 3Y2y5YK7 Call-in: 832-680-2579 Phone Conference ID: 499 589 276#
Bid opening: October 14, 2026 at 11:30 AM (Chicago) — BGE, Inc. 101 W Louis Henna Blvd, Suite 400 Austin, TX 78728
Questions due: October 7, 2026 at 5:00 PM (Chicago)
Questions asked: 20
Bid documents (download requires a free CivCast account):
Drainage infrastructure, including approximately 18-48 inch RCP, 6x3 to 9x5 foot RCB, box manholes, headwalls and appurtenances; water piping including 8-12 inch PVC mains and appurtenances; gravity wastewater piping consisting of 8 inch PVC pipe and appurtenances; excavation, embankment, and paving; sedimentation and erosion control; and various other site improvements.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The bid will be awarded to the lowest bidder. However, the best schedule will be considered when evaluating bids. </p>""b2544260-22cc-4829-b1de-86dfaa49ec48""2026-09-24T14:56:04.234Z"false"<p>Yes, retaining walls are to be concrete. See sheets 81-82 for details. </p>""50807e40-e4d5-4495-a34c-d9202bfd28fc""2026-10-09T15:36:59.99Z"false"<p>Gravity retaining walls will not be accepted. </p>""5cd538c4-73c6-46d5-a5e4-9826bb4ab136""2026-10-09T15:37:40.088Z"false"<p>The pre-bid meeting was non-mandatory. </p>""8cac8cce-060c-4a5c-9c86-5ec3b002ed0d""2026-10-05T13:52:54.089Z"false"<p>A line item has been added to the bid sheet for mailbox pads. Contractor is to supply the pads only. Kiosks are provided by others. </p>""8da2073d-e943-4aca-a4e5-19e2b309a7ad""2026-10-09T15:54:09.251Z"false"<p>The quantity has been updated on the bid sheet. The revised bid sheet will be provided in Addendum 1. </p>""177b8fcc-492d-46c8-abce-b4e459cf9d0c""2026-10-09T15:37:56.947Z"false"<p>Correct. The contractor is responsible only for sidewalk shaded "to be constructed with subdivision improvements". The remaining sidewalk will be constructed by others. </p>""e5253406-9894-41df-aa9f-d0fc80916c6e""2026-10-09T15:55:54.565Z"false"<p>The quantity has been revised on the bid sheet. </p>""9e7de281-e854-4de5-b196-d0e649994f84""2026-10-09T22:46:35.361Z"false"<p>Revegetation of lots is not required. The quantity for revegetation outside of the ROW has been revised. </p>""e0e01e87-bdfe-463a-b38f-a3f8ed328e40""2026-10-09T16:26:43.064Z"false"<p>See the street plan and profile sheets for street classifications. Collector streets are as follows: </p><p></p><p>Golden Sky Drive - Sta 8+31 - END </p><p>Flowers Avenue Sta 7+17 - END </p>""aa1c88d6-c72f-459a-9504-35305c73e2d9""2026-10-09T19:29:18.365Z"false"<p>The quantity for subgrade prep has been adjusted.</p>""a1b55634-8bcd-4d8f-8872-ae6e4df206ac""2026-10-09T19:31:49.485Z"false"<p>Contractors are to price import of suitable material from offsite. </p>""5bc921f2-416d-4de0-b26f-0a67d05cd22a""2026-10-09T16:27:22.078Z"false"<p>Confirmed 14 short side single services and 22 long side single services. </p>""c44e07a3-9805-4c5e-895b-a3bc9b911c87""2026-10-09T20:02:03.057Z"false"<p>All rip rap is class I mortared. A separate class line item for the mortared rock rip rap trickle channel has been added to the bid sheet. </p>""44bc8a3e-5a07-416a-8e4e-dd6e4107748b""2026-10-09T19:48:38.45Z"false"<p>A line item for class I mortared rock rip rap channel has been added to the bid sheet. </p>""c7eca4ce-8e6a-4d1f-b358-b05b26d0bf58""2026-10-09T19:49:19.208Z"false"<p>Contractors are to provide 4' tall wrought iron fence to be mounted on top of wall. A line item has been added to the bid form. </p>""ba8729a0-e356-4645-918f-62734c92b5dd""2026-10-09T16:53:54.023Z"false"<p>Storm trenches may use native material for backfill above the standard bedding envelope. </p>""e54956ce-73b3-4659-be9f-5b075a7f65ba""2026-10-09T20:10:31.95Z"false"<p>Quantities for irrigation sleeves have been revised. </p>""25c8835b-2a14-4337-b4e8-1d0f6bcb3de9""2026-10-09T20:18:42.936Z"false"<p>A line item has been added for adjusting existing manholes to grade. </p>""16fd5c4d-fefb-42ec-b06b-1f61f835147c""2026-10-09T22:47:38.871Z"false"<p>A line item has been added for adjusting existing wastewater service cleanouts to grade. </p>""004e4655-6a13-4b6c-bce3-be075b37fff3""2026-10-09T22:48:06.161Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aab1e58212472048c5158ea), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.