Work of the project generally includes the installation of one potable water well at the City of Heath’s north elevated storage tank and one potable water well at the City of Heath’s pump station. The work at each well includes but is not limited to: Drilling and completion of two approximately 3,420 ft deep wells, installation of well casing, column pipe, blank liner, stainless steel screening, discharge piping, associated pipe appurtenances, electrical equipment, pump, motor, treatment, and site civil improvements.
Type of work: Water Well Construction
Pre-bid meeting: September 29, 2026 at 2:00 PM (Chicago) — Heath City Hall
Bid opening: October 20, 2026 at 2:00 PM (Chicago) — Heath City Hall
Questions due: October 9, 2026 at 11:45 PM (Chicago)
Questions asked: 20
Bid documents (download requires a free CivCast account):
Work of the project generally includes the installation of one potable water well at the City of Heath’s north elevated storage tank and one potable water well at the City of Heath’s pump station. The work at each well includes but is not limited to: Drilling and completion of two approximately 3,420 ft deep wells, installation of well casing, column pipe, blank liner, stainless steel screening, discharge piping, associated pipe appurtenances, electrical equipment, pump, motor, treatment, and site civil improvements.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>An estimated cost is not available.</p>""8e5784b6-38ec-4269-bee4-b631fba5e91e""2026-09-28T23:27:37.515Z"false"<p>This is addressed in Addendum 1.</p>""1e28efb7-1cb8-4b47-87f8-fdf27cef7f5b""2026-09-28T23:28:04.416Z"false"<p>Arc flash studies, fault current analyses, and breaker coordination studies are required for both well sites per Note 2 on Sheets E9 and E10. The contractor shall coordinate with the utility company to obtain transformer data for the new electrical service. </p>""86f286da-f3b2-494c-9a9b-31fedd9ef472""2026-09-28T23:28:17.18Z"false"<p>Bid Item No. 13 includes the programming services by Supertech Automation required to integrate the proposed well sites into the City’s existing SCADA system, including modifications to the existing PLC and SCADA HMI as indicated in the Contract Documents. Refer to Section 26 09 10, Instrumentation, including Paragraph 1.04, for system responsibility and coordination requirements. The Contractor shall coordinate directly with Supertech Automation during the bid period to establish the required scope of programming and integration services necessary to provide a complete and functional system and shall include the associated services in Bid Item No. 13.</p>""ab936f85-5bf6-49b7-8d85-80ffb1dde8af""2026-09-28T23:28:27.044Z"false"<p>The contractor is responsible for furnishing, installing, and programming the proposed PLC at the well site. This responsibility also includes integrating the new PLC signals with the existing PLC system, modifying the existing PLC as required to accept those signals, and ensuring proper communication and reporting to the SCADA system. The contractor’s system integrator shall be responsible for reprogramming the existing PLC to accommodate the proposed Well 4 PLC signals, integrating the associated control and monitoring functions, and verifying operation between the new PLC, the existing PLC, and the SCADA system. </p>""4fd4f80a-588e-473a-8c0f-7b2131d70c6c""2026-09-28T23:28:38.113Z"false"<p>Corrected Conduit Schedules have been provided in Addendum 1.</p>""21e8f489-ba54-4ea0-972a-e1079b62d664""2026-09-28T23:28:47.915Z"false"<p>Contractor shall bid the project as designed and indicated in the contract documents.</p>""584f6993-acf2-4592-8655-355acbada4b2""2026-09-30T20:59:53.929Z"true"<p>This is addressed in Addendum 3.</p>""10028716-2e81-4f09-859b-68337f2ff851""2026-10-08T17:58:33.469Z"false"<p>The VFD shall be 6-pulse in accordance with the electrical one-line diagrams. This is addressed in Addendum 1. </p>""04e088ac-b50f-45dd-8c76-ea1dee1dc47e""2026-09-28T23:29:02.343Z"false"<p>Water will be provided by the City of Heath via an onsite fire hydrant.</p>""425fbc29-6e55-4563-87c3-c747d115988e""2026-09-30T21:01:22.058Z"false"<p>No approved equals will be evaluated during bidding.</p>""6f536dd2-a4ce-4557-8b0a-71f8e393e641""2026-09-30T21:02:13.162Z"false"<p>The CAT6e connection shown is intended for local communication between CP-01-004 and the existing PLC. Remote communication to the City’s SCADA system shall utilize the existing SCADA communication system. Per Note 8 on Sheet E19, Contractor shall provide all necessary PLC and radio hardware required for communication and integration into the City’s existing SCADA system and coordinate with the City’s system integrator. The existing PLC shall be reprogrammed as required to integrate the new well signals and transmit the data through the existing SCADA system. </p>""c7435b9f-eac1-4755-9bc4-14e51f5a6e31""2026-10-02T21:06:24.592Z"false"<p>Meeting minutes and sign in sheet have been posted.</p>""5108c6de-6f55-4480-8c0c-151837b32176""2026-09-30T21:20:06.541Z"false"<p>All underground conduit shall be installed in concrete-encased duct bank.</p>""cbee0210-8a54-4f45-8c79-9ccf44ec2337""2026-10-08T23:36:43.586Z"false"<p>VFD cooling shall be designed by VFD manufacturer.</p>""6f6910cc-5f4b-483f-a236-08957f313c30""2026-10-08T23:36:26.57Z"false"<p>The equipment manufacturer shall design and fabricate the enclosure. </p>""717dab4a-d378-49f4-be26-ed248fd268a4""2026-10-08T23:36:08.533Z"false"<p>Sheet C2 from Addendum 3 supersedes the previously issued information on Sheet C1. The intent of the design is for the proposed 8-inch water line to connect to the dedicated fill line as shown on Sheet C2. This is not an alternate bid item.</p>""9e99aa02-dc73-4c0a-adf4-1738e05f16b4""2026-10-08T23:35:56.404Z"false"<p>No approved equals will be evaluated during bidding.</p>""fe7716cc-2a57-4ec8-9a1d-30dfb3c493a7""2026-10-08T23:35:04.106Z"false"<p>This is addressed in Addendum 4.</p>""d315cfaa-afe8-4f58-aad9-57e01ee546ea""2026-10-08T23:38:07.842Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">No approved equals will be evaluated during bidding.</span></p>""2b1719a9-8231-4f06-9fe6-26205cecaf8e""2026-10-09T17:40:52.316Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa9b943c7751fcbc9922ec4), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.