Public roads, associated utilities, landscape improvements, and a TxDOT turn lane.
Pre-bid meeting: September 14, 2026 at 2:00 PM (Chicago) — 5301 Southwest Parkway, Building 2, Suite 100, Austin, TX 78735 — Mandatory in-person meeting
Bid opening: October 16, 2026 at 2:00 PM (Chicago) — 5301 Southwest Parkway, Building 2, Suite 100, Austin, TX 78735 — In-person meeting
Questions asked: 52
Bid documents (download requires a free CivCast account):
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>This project follows COA requirements. Refer to COA <span style=\"background-color: rgb(242, 242, 243); color: rgb(49, 51, 53);\">Standard Specifications Manual.</span></p>""35e293f1-6c3e-4e98-9f47-c2ea2cf4c55d""2026-10-02T21:23:31.366Z"false"<p>The geotech reports are available in CivCast.</p>""a31d9beb-2274-47f0-8994-996f124e11da""2026-10-02T21:23:56.22Z"false"<p>Yes, all typical bonds are required for this project.</p>""af1dd5ad-ff35-4115-ac51-d97b2f8ecdf7""2026-10-02T21:24:53.79Z"false"<p>300 Substantial / 345 Final Completion</p>""9a748048-c2a9-4f97-b2fe-c7fb02c31f64""2026-10-02T21:25:04.694Z"false"<p>$1,000 / Day</p>""c1a0cd34-3404-42a5-bfd4-5a98d83fd708""2026-10-02T21:25:15.101Z"false"<p>10%</p>""b1b09c83-453d-486a-a67f-bfd39401e951""2026-10-02T21:25:22.947Z"false"<p>This is a MUD project. We are still waiting for the response from the MUD engineer. We will provide it as soon as possible.</p>""886f6444-86b9-4e79-8399-856cb638ee79""2026-10-02T21:26:09.652Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">This is a MUD project. We are still waiting for the response from the MUD engineer. We will provide it as soon as possible.</span></p>""63487811-7769-422e-8db7-c5e834ec55a1""2026-10-02T21:26:26.487Z"false"<p>The mandatory pre-bid sign-in sheet has been uploaded to the Bid Documents section.</p>""16affcb0-763d-4603-91ab-327633c76e73""2026-09-28T22:46:05.78Z"false"<p>The irrigation plans will be available next week.</p>""bf6ccb5b-dad3-474c-9761-eccd1b856733""2026-10-02T21:26:53.069Z"false"<p>The entry signage plans will be available next week.</p>""c20b12e3-3fe3-4c29-afbc-472fb788a1c3""2026-10-02T21:27:37.079Z"false"<p>This is correct.</p>""bd5d48bf-100a-4a88-b860-efdec08a624f""2026-10-02T21:27:53.677Z"false"<p>We have uploaded the geotechnical reports for this site. If additional potholing is required, please obtain the owner's permission before causing any disturbance to the site.</p>""a50d69bf-9522-4a36-bdae-cb9f6cbcb134""2026-09-28T22:50:05.026Z"false"<p>MRP HTPB, LLC,</p><p>a Delaware limited liability company</p><p></p><p>\t6900 E. Camelback Road, Suite 800</p><p>\tScottsdale, AZ 85251</p>""14242e1d-df2f-438a-9271-d8bd0d1bd415""2026-10-02T21:28:13.845Z"false"<p>Common Bermuda. See Plant Schedule, sheet LP012. Planting soil: Whittlesey City of Austin Mix Bulk or approved equal.</p>""13a78744-5d2a-4a42-8c46-b34c26a481a7""2026-10-02T21:31:10.468Z"false"<p>Planting soil: Whittlesey City of Austin Mix Bulk or approved equal.</p>""3bc73ffc-0d69-4666-a223-308dd4876f2c""2026-10-02T21:31:22.693Z"false"<p>Irrigation SF number includes the planting in the ponds. All irrigation around the ponds to be temporary, potable.</p>""addf0a57-d2bc-49cb-b17f-ff713aa33845""2026-10-02T21:31:42.492Z"false"<p>\tIrrigation SF number includes the SF of planting beds. All irrigation around the ponds to be permanent, potable.</p>""8fd03227-b897-4392-95bc-fad182c95c9a""2026-10-02T21:31:55.434Z"false"<p>Michael Stevens, michael.stevens@tripointehomes.com</p>""eb049548-dfdd-472f-97b8-d56f2592ef07""2026-09-28T22:51:44.503Z"false"<p>Based on the pipe dimensions labeled in the plans, the total length of 18" RCP is 411 LF. We will revise the bid sheet in the addendum scheduled for next week.</p>""0c11c1cc-12d3-4f5f-bb99-873867c69d25""2026-10-02T21:34:14.162Z"false"<p>Agreed, the total number of 4' Manholes over RCB is 4. We will revise the bid sheet in the addendum scheduled for next week.</p>""d8584460-ec54-40d3-bdf2-c353e4d6446f""2026-10-02T21:35:04.675Z"false"<p>After verifying this quantity, we still get 1,760 SY.</p>""799e71cf-c68a-455e-b43c-0c9ecd1a5c55""2026-10-02T21:36:02.999Z"false"<p>After verifying this quantity, we agree that the total number of 12" GV is 3, and the total number of 16" GV is 5. <span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">We will revise the bid sheet in the addendum scheduled for next week.</span></p>""d4fcd13e-70fd-4082-9317-402b293d57c2""2026-10-02T21:38:47.567Z"false"<p>Agreed. We will revise the bid sheet to include this bid item in next week’s addendum.</p>""91e23bf9-6808-48d1-9be3-acb09ce8667e""2026-10-02T21:40:03.46Z"false"<p>Agreed. The total length of the 4'-6" Schedule 40 PVC utility sleeves is 978 LF. We will revise the bid sheet to include this quantity in next week’s addendum.</p>""5b93360b-f9bb-4c7b-9f61-682bfaac3b6f""2026-10-02T21:41:07.393Z"false"<p>We have revised the bid sheet to include Tri Pointe at Pearson Ranch Phase 1. The addendum letter, construction plans, CAD files, geotechnical report, and updated bid sheet are now available on CivCast. The bid opening date has also been revised.</p>""033ee98e-b9bd-4e88-b38d-6aa4d63b157e""2026-09-28T22:57:38.49Z"false"<p>The collector pavement section for Pearson Market Circle and Inspire Drive will continue through the intersections with the local streets and will control through the intersection area. The transition to the local street pavement section will occur beyond the intersection.</p>""a8fa9b11-f4f7-411c-b629-5df818c8a6ae""2026-09-28T22:59:59.539Z"false"<p>Subgrade extension of 3' beyond back of curb is acceptable.<span class=\"ql-cursor\"></span></p>""7db43f35-a215-495f-8d99-61d470af5e49""2026-09-29T18:31:26.627Z"false"<p>Any material will need to be sized to 79G requirements and stockpiled in Phase 2. A stockpile exhibit will be provided next week.</p>""ab5d04c9-813f-41d3-947f-d11061d483b3""2026-10-02T21:29:46.501Z"false"<p>Any material will need to be sized to 79G requirements and stockpiled in Phase 2.</p>""ce3c8ff5-6127-40e2-a191-0bb43061df41""2026-10-02T21:30:09.396Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Agreed. We will revise the bid sheet to revise the bid quantity of this bid item in the next addendum.</span></p>""bdfef146-253f-4d81-906f-0e05ceb93983""2026-10-06T19:38:45.459Z"false"<p>N/A</p>""361c9edb-a49c-40d7-829c-9f52071af731""2026-10-06T16:17:30.231Z"false"<p>N/A</p>""0093260e-f613-433a-b7d8-6117d8b1b5c2""2026-10-06T16:17:30.783Z"false"<p>Pond revegetation is included in the Landscape Improvements bid sheet. Therefore, the bid item for the erosion control blanket is limited to furnishing and installing the Rollmax S150 (or approved equal) blanket.</p>""8ccab7aa-7e09-4029-9fbe-339aba73063f""2026-09-28T23:08:16.754Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">After verifying this quantity, we still get 4,888 SY. This quantity matches if you remove the pilot concrete channel and the outflow structure from the pond area.</span></p>""d1b2c867-46b3-404c-8c2e-806536627298""2026-10-02T21:44:30.063Z"false"<p>We have revised the CAD-Pearson Ranch West Phase 2.dwg to include the latest contours that match the plans. The only area that was revised is the eastern end of Banks Street, near the intersection with Inspire Drive.</p>""b186be84-45fc-49f2-b79d-db503c82237d""2026-10-06T16:32:55.847Z"false"<p>I have requested the CAD file for the TxDOT portion. We will include <span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">it in next week’s addendum.</span></p>""48f03a16-e741-4da8-bb91-b16ae2cf221d""2026-10-02T21:46:08.918Z"false"<p>The Pearson Ranch West Two plans and CAD files control over any improvements located outside the TxDOT ROW.</p>""ca6198b2-3df3-4919-bda6-f6619cb1900c""2026-10-02T21:47:53.855Z"false"<p>We will provide this information next week.</p>""2ae86700-9a34-4373-8134-3b5206d5d442""2026-10-02T21:48:30.35Z"false"<p>No, COA has already approved the precast manholes.</p>""6a2449f0-753c-44c0-9241-75a45a36c3b3""2026-10-02T21:49:20.831Z"false"<p>Any "approved equal" item will be reviewed after the bid.</p>""88416eb8-5b0a-42e4-a944-74e3ae0127d3""2026-10-02T21:50:11.87Z"false"<p>The pump duty point will vary with time as there are multiple phases in this development. In the fully developed conditition the total dynamic head will be approx 165 ft. I will coordiante with the electrical engineer on the pump selection and provide more information this week.</p>""ec77f667-1ff5-4907-80b3-d040763759d6""2026-10-06T19:10:39.774Z"false"<p>The correct wet well dimension is 5 feet. We will revise the plans to correct sheet 120.</p>""44217fad-4b84-4f89-8c81-14e1eba00101""2026-10-06T19:17:21.853Z"false"<p>Yes. The bid sheet included in Addendum #1 includes all the construction items for this section.</p>""8f69da05-7275-4663-9e1d-9cbebb311dc4""2026-10-09T15:12:54.025Z"false"<p>We will include this information in addendum number 2. </p>""cff76b57-ca79-4720-8fc9-612b5ba0fbab""2026-10-09T15:11:42.627Z"false"<p>Yes, but they are not included in this bid as we are still working with Texas Gas on the design.</p>""9179f73b-4f8f-4fd1-bad9-23a5f6d5d140""2026-10-09T15:10:57.618Z"false"<p>We confirm both phases are included in the bid.</p>""03229edd-ca99-447c-8c6e-764342ab4e8f""2026-10-09T15:10:14.089Z"false"<p>Please coordinate with Michael Stevens</p>""a6daf4ad-1d65-4c6b-acc5-8eb3f3f88a72""2026-10-09T15:10:17.736Z"falseRead from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa8203ab72cfbc33408b805), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.