The work includes construction of a fourteen-foot (14') diameter concrete lift station wet well complete with three (3) submersible pumps with all accessories, riser piping, valves, and supports; protective coatings, drum scrubber odor control system; bollards; demolition and replacement of hose bibb and hose rack at the existing lift station; grout fill and abandonment of the existing 21” PVC sanitary sewer to the existing lift station; facility start-up in its entirety; installation of new utility electrical service and meter rack; relocation and modifications to the existing lift station control panel; electrical manholes; underground duct banks with wires and conduits; wires and conduits to the electrical rack and lift station control panel; terminal boxes and instrumentation at the lift station; demolition of aboveground electrical items at the existing lift station; grounding; delivery, assembly and lease of the 510,000 gallon per day (gpd) interim packaged wastewater treatment plant facilities in a bullseye configuration, with all accessories, equipment, piping, concrete plant foundation and related concrete pads, etc, for a complete and operational system; 350kW (minimum) generator with fuel tank, concrete foundation and walkway platforms; automatic transfer switch; and electrical distribution rack and equipment including concrete foundation, modifications to existing Train No. 1; demolition work at the existing lift station; site work; yard piping and manholes; and the effluent sampler concrete pad.
Pre-bid meeting: September 24, 2026 at 11:00 AM (Chicago) — Teams Meeting — Not mandatory. Join: https://teams.microsoft.com/meet/224202180844641?p=STPH92Dk8qngqi95Xp Meeting ID: 224 202 180 844 641 Passcode: C8Pu9Ud2
Bid opening: October 16, 2026 at 11:00 AM (Chicago) — Team Meeting — Join: https://teams.microsoft.com/meet/281249187276845?p=hQD1H0YUQeeYBpevqM Meeting ID: 281 249 187 276 845 Passcode: hs2tt6M2
Questions due: October 13, 2026 at 11:00 AM (Chicago)
Questions asked: 8
Bid documents (download requires a free CivCast account):
The work includes construction of a fourteen-foot (14') diameter concrete lift station wet well complete with three (3) submersible pumps with all accessories, riser piping, valves, and supports; protective coatings, drum scrubber odor control system; bollards; demolition and replacement of hose bibb and hose rack at the existing lift station; grout fill and abandonment of the existing 21” PVC sanitary sewer to the existing lift station; facility start-up in its entirety; installation of new utility electrical service and meter rack; relocation and modifications to the existing lift station control panel; electrical manholes; underground duct banks with wires and conduits; wires and conduits to the electrical rack and lift station control panel; terminal boxes and instrumentation at the lift station; demolition of aboveground electrical items at the existing lift station; grounding; delivery, assembly and lease of the 510,000 gallon per day (gpd) interim packaged wastewater treatment plant facilities in a bullseye configuration, with all accessories, equipment, piping, concrete plant foundation and related concrete pads, etc, for a complete and operational system; 350kW (minimum) generator with fuel tank, concrete foundation and walkway platforms; automatic transfer switch; and electrical distribution rack and equipment including concrete foundation, modifications to existing Train No. 1; demolition work at the existing lift station; site work; yard piping and manholes; and the effluent sampler concrete pad.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Rehlko will be added to the list of acceptable manufacturers in an upcoming addendum.</p>""afdef8d4-170a-4784-8a2e-eb53034f26a3""2026-09-17T20:51:14.241Z"false"<p>Polymer concrete will not be added as an approved product on this project.</p>""b9cda064-a4f7-47e8-884d-352a0f9a7f83""2026-09-17T22:26:42.875Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Taylor Power will be added to the list of acceptable manufacturers in an upcoming addendum.</span></p>""8be271d9-8d9d-48c9-963f-0adca3c91a50""2026-09-18T15:07:09.538Z"false"<p>The bid opening has been rescheduled to 10/8/26 via Addendum No. 2 posted this afternoon.</p>""2afe1eb9-1b5b-4b84-b213-95ef2c609709""2026-09-23T19:18:48.123Z"false"<p>Direct bury is acceptable. See Direct Buried Detail on Sheet E6.</p>""ca6a8147-5004-4624-82dc-630f980a4397""2026-09-28T22:40:43.678Z"false"<p>The blowers are proposed as 100 HP each.</p>""2fcec235-405b-4965-9306-21c0f26d87ba""2026-09-28T22:41:54.999Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa1cbbc0d5adb0f1a6456b6), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.