Removal of existing pavement and installation of approximately 26,500 SY of concrete roadway, install curb inlets and culvert system, replace 5,600 linear feet of sanitary sewer, and replace 5,800 linear feet of waterline.
Type of work: Concrete, Waterline, Sewer
Engineer's estimate: $5,500,000
Pre-bid meeting: October 14, 2026 at 10:00 AM (Chicago) — Azle City Hall, 505 W. Main Street, Azle, Texas, 76020
Bid opening: October 28, 2026 at 3:00 PM (Chicago) — Azle City Hall, 505 W. Main Street, Azle, Texas, 76020
Questions due: October 20, 2026 at 5:30 PM (Chicago)
Questions asked: 24
Contractors must obtain a set of CONTRACT DOCUMENTS online at www.jacobmartin.com by digital download or hard copy to be considered a registered plan holder eligible to bid the project. Cost for digital download of CONTRACT DOCUMENTS will be $0.00.Hard copies of the CONTRACT DOCUMENTS will be $100.00 All Copies of the CONTRACT DOCUMENTS must be ordered online and are available for pick up, mail out or digital download via www.jacobmartin.com. Upon verification of online payment, hard copies may be picked up at Jacob & Martin, LLC, located at 1925 Fort Worth Highway, Weatherford, Texas 76086.
Removal of existing pavement and installation of approximately 26,500 SY of concrete roadway, install curb inlets and culvert system, replace 5,600 linear feet of sanitary sewer, and replace 5,800 linear feet of waterline.
We post new concrete opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The contractor pays the City per Specification Item 01 02 01 Section 1.18. Clarification will be issued for any conflicts in this section.</p>""50f40431-9e0d-4242-af3e-7f4924af99f8""2026-09-10T19:23:24.909Z"false"<p>Contractor</p>""06eef8fc-4222-43fe-a8c3-3ba524c9b82b""2026-09-28T21:28:21.589Z"false"<p>Per the general conditions, the contractor shall pay for materials testing.</p>""c1583034-7428-49b6-84fb-62734e32af62""2026-09-10T19:23:42.903Z"false"<p>No. </p>""ce1b0ed5-955c-422a-9aba-af33a62cfcaa""2026-09-10T19:24:01.442Z"false"<p>It would be anticipated to be January 2027.</p>""023fde3c-c616-4bd2-9022-bdd523fd991d""2026-09-10T19:24:26.082Z"false"<p>January 2027</p>""b745ff0e-8810-4c78-83d9-924b89743da6""2026-09-28T21:28:00.975Z"false"<p>That is in process.</p>""ebd40ef3-a463-439f-8ac0-4795c92c97fa""2026-09-10T19:24:44.168Z"false"<p>Yes, to the best of our knowledge</p>""09dc0594-c09c-40e6-ba16-5f400337fd22""2026-09-28T21:28:06.743Z"false"<p>No</p>""281cef1d-1bd4-4ae1-adca-8e13eba01c6a""2026-09-10T19:25:01.168Z"false"<p><strong>The specifications will take priority for bedding and call for Class 2 Aggregate. This will be clarified by addendum.</strong></p>""d36aa53d-5c63-4b49-b2f1-a8f01845cf51""2026-09-28T21:32:47.449Z"false"<p><strong>There are a total of 43 water line reconnections. 21 of these only require reconnection in place. The other 22 require relocation as well as reconnection.</strong></p>""638d6cdb-4e92-4905-94a3-597d267eec6a""2026-09-28T21:36:23.592Z"false"<p><strong>We will allow PVC as an acceptable alternative in lieu of PVC. It will be included in an addendum.</strong></p><p> </p><p> </p>""248cf305-fbb4-4ed7-bb43-8abac7e9c30d""2026-09-28T21:37:22.223Z"false"<p><strong>Class 2 aggregate shall be used for bedding and to 12” above the pipe. Native material may be used above that level. This will be clarified in an addendum.</strong></p>""dca69ca5-0cbb-4e54-bcc0-7622d8fb0265""2026-09-28T21:37:47.194Z"false"<p><strong>See answer to Question 1&4 above. Native material will be acceptable for backfill and there will be no additional payment for imported bedding or backfill.</strong></p>""78f42d9e-12cd-472b-bd2d-fb76fea1c49f""2026-09-28T21:39:06.645Z"false"<p>The cold mix requirement will be removed by addendum since the entire street section will be reconstructed. Crushed base will be used for temporary fill where necessary. This will be clarified by addendum.</p>""c73d74a4-bd1e-42af-bfa4-34b9cff71719""2026-09-28T21:40:47.843Z"false"<p>See answers to similar questions regarding bedding and backfill above.</p>""80ee909a-142e-4164-b7ff-7eec94d20f8b""2026-09-28T21:41:39.442Z"false"<p>Yes</p>""aced4083-045e-4cd3-ab15-ad7c28546059""2026-09-28T21:42:20.099Z"false"<p>A deductible alternate will be added for gas line bores (not encasement).</p>""300660f6-971b-4b79-86f5-2bca7779bc72""2026-09-28T21:43:12.118Z"false"<p>The plans do not call for pressure regulators.</p>""c7a2190a-919e-4a29-adfb-0f5a501575b8""2026-09-28T21:43:40.106Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa15af72419b8d5ec06e7d4), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.