Type of work: New 500,000 Gallon Elevated Storage Tank, Plant Piping, Distribution Piping, Building, Electrical and Controls, Access Road, Fencing, and purchase and delivery of 3,000 residential water meters
Pre-bid meeting: September 15, 2026 at 10:00 AM (Chicago) — South Cleveland Water Supply Corporation Office 561 County Road 331, Cleveland, Texas, 77327 — Mandatory Prebid
Bid opening: October 13, 2026 at 2:00 PM (Chicago) — South Cleveland Water Supply Corporation Office 561 County Road 331, Cleveland, Texas, 77327
Questions asked: 13
Bid documents (download requires a free CivCast account):
The work consists of a New 500,000 Gallon Elevated Storage Tank, Plant Piping, Distribution Piping, Building, Electrical and Controls, Access Road, Fencing, and purchase and delivery of 3,000 residential water meters.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No.</p>""78412d57-23c2-4665-bcfd-bdb677f9e3dd""2026-09-11T21:19:14.829Z"false"<p>No.</p>""0141640a-dda4-4969-8dec-7e1950321ed6""2026-09-11T21:19:24.381Z"false"<p>Will address on Addendum.</p>""56094a2c-0f5c-4077-b42b-b162ce0208ca""2026-09-22T19:43:05.496Z"false"<p>Section 2100 of the Specifications does not list a specific provider for chlorination equipment except the chlorinator pump.</p>""fa2e5a21-5c29-4ede-b7b8-05053edb8623""2026-09-29T18:52:00.904Z"false"<p>nm</p>""e34e430e-4427-404e-94ab-2b62f09d100d""2026-09-30T00:07:18.787Z"false"<p>nm</p>""c3f41138-0336-4545-973d-f676b7926f56""2026-09-30T00:07:28.554Z"false"<p>will be on addendum</p>""61a2850f-1fb6-4dac-853d-dfc2cfb67869""2026-10-06T17:14:49.883Z"false"<p>Addendum will be issued tomorrow.</p>""d69d700e-91f8-4cf1-827e-f6c864cdb7ad""2026-10-06T20:43:10.892Z"false"<p>Induron Coatings are not approved at this time</p>""511759b7-b227-45dc-ad13-0eb93cfae538""2026-10-07T17:30:56.759Z"false"<p>Yes</p>""3f1726f5-2926-4b74-8038-6d539f86cb82""2026-10-06T20:43:29.079Z"false"<p>Yes, this project is to comply with the BABAA.</p>""229ebf79-2bc1-4074-98f7-ba20356eb483""2026-10-06T15:24:13.147Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(34, 34, 34);\">Only the twin obstruction lights located at the very top of the EST are required. The additional “D” fixtures shown around the perimeter of the tank are not required and shall be removed from the scope of work.</span></p>""dd9ad2e6-7787-403c-999a-1b6d9adc5435""2026-10-07T18:25:09.535Z"false"<p>6 foot chain link fence with 3 barbed wire course at the top.</p>""8532ae11-e9f3-4d47-a2c4-1f641fed5492""2026-10-08T21:46:50.985Z"false"<p>No</p>""eac3e387-4224-4632-b351-20c7e0f53800""2026-10-09T01:44:19.487Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a98963af838a25fcc363d4d), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.